ADNOC Offshore
Location
Abu Dhabi, UAEOverview
Based in Abu Dhabi, UAE, ADNOC Offshore is a developer or client.
It is named as the client on 21 contract awards.
Company type
| Role | Developer or client |
Key facts
| Based in | Abu Dhabi, UAE |
Contracts awarded
| Contract | Scope | Contractor | Role | Value | Date | Status | Source |
|---|---|---|---|---|---|---|---|
| Umm Shaif Gas Cap - offshore package 2 | EPCI incl. ~30,000t gas compression system | McDermott | EPC | c. AED 3,672.5mUSD 1bn | 24 Aug 2026 | Checked | SaudiGulf Projects, MEED (free teaser) |
| Umm Shaif Integrated Gas Cap and Surface Pressure Boosting - Package 4 | Umm Shaif: raise gas recovery and output via surface pressure boosting - New offshore boosting facility: jacket + topsides (among heaviest modules in region), brownfield tie-ins; yard QMW Qingdao; >US$1bn | McDermott / Qingdao McDermott Wuchuan (QMW) | EPC | c. AED 3,673mUSD 1bn | 24 Aug 2026 | Checked | World Oil, Offshore Technology, Offshore Engineer |
| Umm Shaif Gas Cap and Surface Pressure Boosting - Package 1 (subsea pipelines) | EPCIC of new offshore facilities incl. 30,000t gas compression system, plus upgrades to existing facilities; fabrication largely at L&T yards | Lamprell / Larsen & Toubro Energy Hydrocarbon consortium | EPC | c. AED 5,766mUSD 1.6bn | 4 Aug 2026 | Checked | MEED, MEED (teaser), TradeArabia |
| Umm Shaif Gas Cap - offshore package 1 | EPCIC incl. ~30,000t gas compression system | L&T Energy Hydrocarbon Offshore / Lamprell | EPC | c. AED 6,426.9mUSD 1.8bn | 4 Aug 2026 | Checked | Larsen & Toubro, SaudiGulf Projects, MEED (free teaser) |
| Umm Shaif Gas Cap - drilling | 14-well drilling and integrated drilling services | ADNOC Drilling | subcontractor | AED 1,340.5mUSD 365m | 21 Jul 2026 | Checked | ADNOC, TradeArabia |
| Das Island crude oil storage tank farm upgrade | Upgrade of crude storage tank farm | Target Engineering Construction Company (ALEC Holdings) | main contractor | c. AED 551mUSD 150m | 15 Jul 2026 | Unconfirmed | MEED |
| Upper Zakum 1.5MMBD expansion - project management consultancy | PMC services for the >$10bn Upper Zakum expansion following the main EPC awards; package split between the three firms not disclosed | Wood / Worley / KBR | PMC | - | 8 Jul 2026 | Unconfirmed | MEED (teaser), MEED Projects |
| Upper Zakum 1.5MMBD expansion - EPC Packages 1 and 3 | Pkg 1: surface facilities on existing artificial islands - gas-lift compressors, produced water reinjection, water treatment, pre-assembled manifolds. Pkg 3: Zirku Island - additional oil tanks, water treatment, export gas compressor, condensate treatment, power and utilities. Raises capacity to 1.5m b/d | Tecnicas Reunidas | EPC | c. AED 20,000mEUR 5bn | 15 Jun 2026 | Checked | Tecnicas Reunidas H1 2026 results, MEED (teaser), TradeArabia |
| Upper Zakum 1.5MMBD expansion - EPC Package 2 (offshore facilities, subsea pipelines and cables) | Offshore facilities incl. subsea pipelines and cables | NMDC Energy | EPC | - | Jun 2026 | Checked | MEED (teaser), TradeArabia, Saudi Gulf Projects |
| Nasr-115 Expansion (Nasr Phase II Full Field Development) | EPCI of two topsides, manifold tower, jacket, bridge, pipelines, subsea cables, brownfield mods | McDermott | EPC | c. AED 2,754mUSD 0.8bn | 22 Jan 2026 | Checked | Offshore Engineer, bne IntelliNews, MEED, Oil & Gas Journal, MEED (free teaser) |
| SARB Deep Gas Development (Ghasha concession) | EPCI of new offshore platform with four gas production wells, connected to Das Island; remote operation from Arzanah Island; up to 200 mmscfd by end of decade | McDermott | EPC | - | 8 Jan 2026 | Unconfirmed | Saudi Gulf Projects, MEED (teaser), Oil & Gas Journal |
| Two jack-up rigs, 15-year contract (Lamprell-built) | 15-year hire of two AI-enabled jack-up rigs built at Lamprell, Sharjah | ADNOC Drilling | supplier | AED 4,223mUSD 1.2bn | 27 May 2025 | Checked | Khaleej Times, Arabian Business |
| Three newbuild island rigs for Zakum (batch 2) | Long-term contract for three AI-enabled island rigs built with Honghua; delivery 2027-28 | ADNOC Drilling | supplier | AED 2,960mUSD 806m | 5 May 2025 | Checked | Offshore Engineer, Baird Maritime |
| Lower Zakum Long-Term Development Plan Phase 1 (LTDP-1) - offshore facilities package (Package 4) | EPC of LTDP-1 offshore facilities; 57-month execution from 31 Mar 2025; one of three EPC packages of a ~$7.5bn programme | NMDC Energy | EPC | AED 9,700m | 14 Mar 2025 | Checked | MEED (teaser), Gulfbase (NMDC Energy ADX disclosure, letter of award), Upstream |
| Lower Zakum LTDP-1 - Al Omairah (G) Island topside facilities (Package 2) | EPC of topside facilities on Al Omairah artificial island; construction started 18 Feb 2026 | Tecnicas Reunidas | EPC | AED 12,464mUSD 3,394m | 12 Feb 2025 | Checked | Tecnicas Reunidas H1 2026 results, MEED Projects, MEED (teaser), MEED (teaser) |
| Lower Zakum LTDP-1 - Das Island processing facilities (Package 5) | EPC of three new oil processing trains, new seawater offshore platform and utilities, crude stabilisation | Target Engineering Construction Company | EPC | - | Feb 2025 | Checked | Wood plc, MEED (teaser), MEED (teaser) |
| Upper Zakum 1.5MMBD expansion - pre-FEED/FEED | Front-end engineering design for the expansion of Upper Zakum to 1.5m b/d; FEED kick-off with ADNOC Offshore 21 Nov 2024; EPC packages later went to Tecnicas Reunidas (P1, P3) and NMDC Energy (P2) | Technip Energies | consultant | - | 29 Nov 2024 | Checked | Upstream, MEED |
| Upper Zakum 1.2MMBD EPC-2 (Assefiya Island facilities) | EPC of gas lift compressor, gas dehydration, vapour recovery, seawater pumps/filtration, nitrogen and air, chemical injection, pipe racks, tie-ins | Target Engineering Construction Company | EPC | c. AED 1,836mUSD 500m | 12 Nov 2024 | Unconfirmed | MEED (teaser), MEED (free teaser) |
| Three newbuild island rigs for Zakum (batch 1) | Long-term contract for three island rigs built by Honghua Group | ADNOC Drilling | supplier | AED 2,692mUSD 733m | 3 Jul 2024 | Checked | World Oil, Khaleej Times |
| Upper Zakum 1.2MMBD EPC-1 | Main EPC package for Upper Zakum expansion to 1.2MMBD | Target Engineering Construction Company | EPC | AED 3,029.8mUSD 825m | Apr 2024 | Unconfirmed | MEED (free teaser) |
| Lower Zakum Early Production Scheme 2 and Proved Developed Producing | Offshore EPC | NMDC Energy | EPC | - | 2024 | Unconfirmed | MEED (free teaser) |
From public announcements, stock exchange filings and press; values as announced.
In the news
- ZawyaTechnip Energies lands ADNOC Offshore engineering services contract26 Aug 2026
- Construction Week OnlineContracts: L&T wins ultra-mega order from ADNOC Offshore4 Aug 2026
- MEEDL&T announces major contract win from Adnoc Offshore4 Aug 2026
- Oil & Gas Middle EastADNOC offshore field awards $47 million cable supply contract9 Jun 2026