ADNOC Onshore

Overview

ADNOC Onshore is classed in the directory as a developer or client based in Abu Dhabi, UAE.

It is named as the client on 11 contract awards.

Company type

RoleDeveloper or client

Key facts

Based inAbu Dhabi, UAE

Contracts awarded

Contracts awarded
ContractScopeContractorRoleValueDateStatusSource
Three Abu Dhabi projects incl. Ruwais Diyab unconventional gas phase 2 (DBO)Design, build and operate contract for Phase 2 gas facilitiesJereh Oil & Gas Engineering CorporationEPCAED 9,915.8mUSD 2.7bn5 Nov 2026CheckedSaudiGulf Projects, MEED (free teaser)
Bab / North East Bab onshore facilities (One Tie-In programme)Framework call-off: tie-ins for new oil producers, modifications at existing producers, water supply/injection/disposal/WAG support, digital upgrades; 60 monthsJereh Oil & Gas Engineering Corporation (Jereh Group)EPCAED 2,200mUSD 599.7m4 Nov 2026UnconfirmedSaudiGulf Projects (citing Jereh Shenzhen Stock Exchange filing)
Bu Hasa onshore facilities (Bu Hasa, Bida Al-Qemzan, Huwaila)Framework call-off EPC: wellhead surface facilities, gathering flowlines, production well and gas lift skids, wellhead control panels, solar power units; 36 months + optional 24Jereh Oil & Gas Engineering Corporation (Jereh Group)EPCAED 1,440mUSD 392.8m4 Nov 2026CheckedMEED (teaser), SaudiGulf Projects (citing Jereh filing)
Ruwais Diyab unconventional gas full developmentDesign-build-operate: wellsite facilities, central processing facility, gas gathering and export pipelines, utilities; 345 mmscfd raw gas from 2029Jereh Oil & Gas Engineering Corporation (Jereh Group)EPCAED 6,260mUSD 1.7bn4 Nov 2026CheckedSaudiGulf Projects (citing Jereh Shenzhen Stock Exchange filing), MEED (teaser), World Oil (FID, no contractor named)
South East off-plot facilitiesWell tie-ins, degassing station upgrades, flowlines, digitalisation; EPC works began Mar 2026China Petroleum Engineering & Construction Corp (CPECC)main contractorc. AED 3,673mUSD 1bn29 Apr 2026UnconfirmedMEED, MEED
South East off-plot facilities (EPCm 2024, converted to EPC 2026)Tie-in of 150+ wells, remote/central degassing station upgrades, 270+ km flowlines, well digitalisationChina Petroleum Engineering & Construction Corporation (CPECC)EPCc. AED 3,672mUSD 1bnMar 2026UnconfirmedMEED, MEED
Multistage hydraulic fracturing services, 5-yearDesign, execution and evaluation of multistage fracturing in conventional and tight reservoirsADNOC DrillingsupplierAED 2,938mUSD 800m30 Jun 2025CheckedWAM (headline only), World Oil, SaudiGulf Projects
South East AIP5 development - on-plot facilitiesEPC of on-plot facilities for South East cluster (Asab, Sahil, Shah, Qusahwira, Mender); completion 2027CPECC / Archirodon consortiumEPCc. AED 5,509mUSD 1.5bnDec 2024UnconfirmedMEED (teaser)
West-East crude oil pipeline - sections 2 and 3 (Habshan-Sweihan, Sweihan-Fujairah)48-inch crude pipeline, ~500 km total route Jebel Dhanna to Fujairah Main Oil Terminal, ~1.5m bpd initial capacity, 27 monthsChina Petroleum Engineering & Construction Corporation (CPECC)EPCAED 1,763mUSD 480m2 Sept 2024UnconfirmedYicai Global, Upstream
Bab field well modification - artificial lift phase 2 (184 wells, seven reservoirs)Well modification / artificial liftRobt Stone Middle EastEPC-Sept 2024UnconfirmedMEED (free teaser)
Asab field and satellites (Sahil, Shah, Qusahwira, Mender) capacity expansion - off-site facilitiesBuild, renovate and upgrade off-site facilities to lift output from 630,000 to 762,000 bpd; 45 monthsChina Petroleum Engineering & Construction Corporation (CPECC)EPCAED 1,458mUSD 397m19 Jul 2024UnconfirmedYicai Global

From public announcements, stock exchange filings and press; values as announced.

In the news

Similar companies