ADNOC Onshore
Location
Abu Dhabi, UAEOverview
ADNOC Onshore is classed in the directory as a developer or client based in Abu Dhabi, UAE.
It is named as the client on 11 contract awards.
Company type
| Role | Developer or client |
Key facts
| Based in | Abu Dhabi, UAE |
Contracts awarded
| Contract | Scope | Contractor | Role | Value | Date | Status | Source |
|---|---|---|---|---|---|---|---|
| Three Abu Dhabi projects incl. Ruwais Diyab unconventional gas phase 2 (DBO) | Design, build and operate contract for Phase 2 gas facilities | Jereh Oil & Gas Engineering Corporation | EPC | AED 9,915.8mUSD 2.7bn | 5 Nov 2026 | Checked | SaudiGulf Projects, MEED (free teaser) |
| Bab / North East Bab onshore facilities (One Tie-In programme) | Framework call-off: tie-ins for new oil producers, modifications at existing producers, water supply/injection/disposal/WAG support, digital upgrades; 60 months | Jereh Oil & Gas Engineering Corporation (Jereh Group) | EPC | AED 2,200mUSD 599.7m | 4 Nov 2026 | Unconfirmed | SaudiGulf Projects (citing Jereh Shenzhen Stock Exchange filing) |
| Bu Hasa onshore facilities (Bu Hasa, Bida Al-Qemzan, Huwaila) | Framework call-off EPC: wellhead surface facilities, gathering flowlines, production well and gas lift skids, wellhead control panels, solar power units; 36 months + optional 24 | Jereh Oil & Gas Engineering Corporation (Jereh Group) | EPC | AED 1,440mUSD 392.8m | 4 Nov 2026 | Checked | MEED (teaser), SaudiGulf Projects (citing Jereh filing) |
| Ruwais Diyab unconventional gas full development | Design-build-operate: wellsite facilities, central processing facility, gas gathering and export pipelines, utilities; 345 mmscfd raw gas from 2029 | Jereh Oil & Gas Engineering Corporation (Jereh Group) | EPC | AED 6,260mUSD 1.7bn | 4 Nov 2026 | Checked | SaudiGulf Projects (citing Jereh Shenzhen Stock Exchange filing), MEED (teaser), World Oil (FID, no contractor named) |
| South East off-plot facilities | Well tie-ins, degassing station upgrades, flowlines, digitalisation; EPC works began Mar 2026 | China Petroleum Engineering & Construction Corp (CPECC) | main contractor | c. AED 3,673mUSD 1bn | 29 Apr 2026 | Unconfirmed | MEED, MEED |
| South East off-plot facilities (EPCm 2024, converted to EPC 2026) | Tie-in of 150+ wells, remote/central degassing station upgrades, 270+ km flowlines, well digitalisation | China Petroleum Engineering & Construction Corporation (CPECC) | EPC | c. AED 3,672mUSD 1bn | Mar 2026 | Unconfirmed | MEED, MEED |
| Multistage hydraulic fracturing services, 5-year | Design, execution and evaluation of multistage fracturing in conventional and tight reservoirs | ADNOC Drilling | supplier | AED 2,938mUSD 800m | 30 Jun 2025 | Checked | WAM (headline only), World Oil, SaudiGulf Projects |
| South East AIP5 development - on-plot facilities | EPC of on-plot facilities for South East cluster (Asab, Sahil, Shah, Qusahwira, Mender); completion 2027 | CPECC / Archirodon consortium | EPC | c. AED 5,509mUSD 1.5bn | Dec 2024 | Unconfirmed | MEED (teaser) |
| West-East crude oil pipeline - sections 2 and 3 (Habshan-Sweihan, Sweihan-Fujairah) | 48-inch crude pipeline, ~500 km total route Jebel Dhanna to Fujairah Main Oil Terminal, ~1.5m bpd initial capacity, 27 months | China Petroleum Engineering & Construction Corporation (CPECC) | EPC | AED 1,763mUSD 480m | 2 Sept 2024 | Unconfirmed | Yicai Global, Upstream |
| Bab field well modification - artificial lift phase 2 (184 wells, seven reservoirs) | Well modification / artificial lift | Robt Stone Middle East | EPC | - | Sept 2024 | Unconfirmed | MEED (free teaser) |
| Asab field and satellites (Sahil, Shah, Qusahwira, Mender) capacity expansion - off-site facilities | Build, renovate and upgrade off-site facilities to lift output from 630,000 to 762,000 bpd; 45 months | China Petroleum Engineering & Construction Corporation (CPECC) | EPC | AED 1,458mUSD 397m | 19 Jul 2024 | Unconfirmed | Yicai Global |
From public announcements, stock exchange filings and press; values as announced.
In the news
- MEEDAdnoc Onshore selects contractors for well tie-ins project27 Oct 2026
- MEEDContractors prepare prices for Adnoc Onshore field facilities project20 Oct 2026
- MEEDEXCLUSIVE: Chinese contractor in front for Adnoc Onshore deal12 Aug 2026
- MEEDContractors submit bids for Adnoc Onshore field facilities project7 Aug 2026
- MEEDContractors prepare bids for Adnoc Onshore field facilities project17 Jul 2026
- MEEDContractors submit best offers for major Adnoc Onshore project20 May 2026