Alhaj Hassan Group B.S.C Closed

Haji Hassan Group (HHG)

Overview

Haji Hassan Group (HHG) is a family-owned Bahraini construction materials and contracting group. It traces its start to 1952, when the late Haji Hassan Al A'ali ran a small manual stone-crushing plant, and it is still led by his family. Over the following decades it added block making, a construction department, asphalt, ready-mix and precast concrete, steel reinforcement, cranes, pipes, tanks and insulation products, and it also owns housing compounds and shopping centres.

The group presents itself today as 14 companies. Bahrain Asphalt, set up in 1965, is its roads and paving contractor; most of the other companies make or supply materials - Haji Hassan Readymix, Bahrain Blocks, Bahrain Precast Concrete, Haji Hassan Reinforcements, Bahrain Pipes, Bahrain Tanks, KRAH Bahrain and Isola - alongside Haji Hassan Cranes, a property arm and newer units such as Evolve and Aba'ad Construction.

Its published references span Bahrain's causeways, the airport, highways and landmark buildings, plus precast work in the UAE, Qatar and Oman. In most of them the group companies supplied materials; the road and paving jobs were carried out by Bahrain Asphalt.

Company type

RoleConstruction group
Legal formB.S.C. (closed), as registered
SectorsRoads and infrastructure, construction materials, property
ServicesAsphalt and road works, ready-mix concrete, concrete blocks and paving, precast concrete, steel reinforcement, pipes and tanks, insulation and waterproofing products, crane hire, mechanical engineering workshop, property

Key facts

Founded1952, Bahrain - started as a manual crushing plant
FounderThe late Haji Hassan Bin Ali Al A'ali
Group companies14, as the group states
ChairmanJalal Al Aali
OwnershipFamily group - managed by the founder's descendants, as the group states
MarketsBahrain; precast and asphalt references in Qatar, the UAE and Oman
Supply referencesAbout 70 references on the group's projects page, most of them material supply (ready-mix, blocks, reinforcement, precast, pipes, insulation) by group companies - among them The Avenues, Bahrain Marina, Marassi Terraces, Bahrain City Center, Four Seasons Hotel, Bahrain International Circuit and Bahrain International Airport
Recent recognitionGreen Factory 2025 certification for Haji Hassan Ready Mix Concrete Company, as the group reports

Projects

  • Dukhan Highway (west contract) - pavement worksPhoto: Bahrain Asphalt
    RoadsCompleted

    Dukhan Highway (west contract) - pavement works

    By Bahrain Asphalt

    Qatar · 2009

    Role
    Pavement works (asphalt and sub-base)
    Scale
    About 42 km of new highway; 1.7 million tons of asphalt and 930,000 tons of sub-base
  • Jasra Interchange - Loop 1 wideningPhoto: Bahrain Asphalt
    RoadsCompleted

    Jasra Interchange - Loop 1 widening

    By Bahrain Asphalt

    Jasra, Bahrain · 2023

    Role
    Contractor
    Scale
    Loop widened from one lane to two
  • Roads

    Jasra Interchange upgrade Phase 2 - precast bridge parapet barriers

    By Bahrain Precast Concrete (BPC)

    Jasra, Bahrain

    Role
    Precast subcontractor - production and installation
    Scale
    Barriers for 5 bridges, about 3,700 m
  • Zallaq cycle tracks (sections A-B-C and C-D)Photo: Bahrain Asphalt
    RoadsCompleted

    Zallaq cycle tracks (sections A-B-C and C-D)

    By Bahrain Asphalt

    Zallaq, Bahrain

    Role
    Contractor - earthworks, civil and asphalt works
    Scale
    6.16 km (A-B-C) and about 4.2 km (C-D)
  • South Bahrain loop road Stage 2 (Tunnel J)Photo: Bahrain Asphalt
    Roads

    South Bahrain loop road Stage 2 (Tunnel J)

    By Bahrain Asphalt

    Bahrain

    Role
    Contractor

Official registrations and listings

  • Electricity and Water Authority (EWA), Bahrain

    Licensed plumbers list

    Listed asAlhaj Hassan Group B.S.C Closed

    See the list · Checked 21 Nov 2026

  • Tender Board, Kingdom of Bahrain - monthly awarded-tenders reports (public-record contract awards, not a register)

    Awarded tenders (monthly reports)

    Listed asAlhaj Hassan Group B.S.C Closed

    See the list · Checked 23 Nov 2026

Contracts on public award lists

Named in Tender Board of Bahrain monthly awarded-tenders reports

ContractYear
RDS-15/0008 - Term contract for civil works (2015-2017) - Ministry of Works - BHD 226,000 (change order)2018
HP/23/16 - Infrastructure works for 862 housing units and 16 residential buildings, sites 221 and 222, block 960, Muruj Al Dur - Ministry of Housing - BHD 9,080,0002017
RDS-15/003 - Upgrade of the Jasra junction - phase one - Ministry of Works - BHD 429,4652016
BAC/158/2015 - Infrastructure works for the fuel station on the airport apron, Bahrain International Airport - Bahrain Airport Company - BHD 218,6352016
RDS-15/0017 - Road projects - GCC Development Programme for Bahrain - Northern City entrance road improvement projects - approval… - Ministry of Works - BHD 7,698,990...2016
HP/03/16 - Infrastructure works for 21 A-ANAD-type housing units, site 226, block 732, Aali - Ministry of Housing - BHD 221,1632016

Titles as the award lists print them; a title ending in "..." was cut short at import.

Group detail

History, structure, leadership, locations and projects of Alhaj Hassan Group B.S.C Closed.

History

  1. milestone

    Haji Hassan Al A'ali starts a small manual stone-crushing plant near Burhama.

  2. expansion

    First manual block machine bought; crushing plant upgraded.

  3. expansion

    First group office opens on Lulu Road; a small tile plant is added.

  4. project

    Construction department set up; first reclamation job at Mina Salman and schools, clinics and hospitals built for the Public Works Department.

  5. expansion

    All plants moved to the Salmabad site.

  6. deal

    Three-year crusher contract secured with Bahrain Petroleum Company (BAPCO).

  7. milestone

    First asphalt plant bought and Bahrain Asphalt set up as the first national asphalt contractor; first airport runway carried out.

  8. expansion

    Asphalt plant moved to Sitra; first phase of Jalal Garden housing compound opens.

  9. project

    Pavement works at the Mina Salman development; calcium silicate plant bought to make lightweight blocks.

  10. expansion

    Haji Hassan Readymix established; Bahrain Precast Concrete Co. formed as a joint venture.

  11. expansion

    Haji Hassan Mechanical Engineering Workshop established.

  12. expansion

    Crane division set up with a 400-ton crane; Delmon Shopping Centre opens.

  13. deal

    Haji Hassan Reinforcement Co. acquired.

  14. expansion

    Arabian Parts Company established; blocks factory moved to Abu Zwaid; Haji Hassan Tower opens in Sanabis.

  15. expansion

    Arabian Chemical Industries (ISOLA) established.

  16. expansion

    Polythene tank factory established; United Precast Concrete (UPC) set up in Dubai; investment in Bahrain Rubber Co.

  17. expansion

    Al A'ali Shopping Complex opens in Seef; Bahrain Pipes Co. established; Bahrain Asphalt opens a Doha branch for sub-base and asphalt work on the Dukhan Highway as a subcontractor.

  18. expansion

    UPC Oman established.

  19. expansion

    UPC Qatar established.

  20. deal

    HSBC partnership through an investment in the BPC Group.

  21. deal

    KRAH Bahrain established as a joint venture.

  22. expansion

    Mobile crane capacity raised to 500 tons.

  23. deal

    KRAH Bahrain fully acquired by the group.

  24. expansion

    New plant for Bahrain Blocks; Evolve Concrete established.

  25. expansion

    Aba'ad Construction WLL established.

  26. project

    Jasra Interchange - Loop 1 widening, Jasra, Bahrain - Contractor

  27. strategy

    Haji Hassan Readymix introduces flooring solutions.

Group structure

Alhaj Hassan Group B.S.C Closed

Subsidiaries

  • Bahrain Asphalt

    Roads and asphalt contractor

  • Haji Hassan Readymix

    Ready-mix concrete

  • Bahrain Precast Concrete

    Precast concrete (joint venture)

  • Bahrain Blocks

    Concrete blocks and paving

  • Haji Hassan Reinforcements

    Steel reinforcement

  • Haji Hassan Cranes

    Crane hire

  • Bahrain Pipes

    Pipes

  • Bahrain Tanks

    Polythene tanks

  • KRAH Bahrain

    Pipes

  • Isola Solutions W.L.L.

    Insulation and construction chemicals

  • Arabian Parts Company

    Parts

  • Haji Hassan Properties

    Property

  • Al A'ali Shopping Complex

    Shopping centre, Seef

  • Evolve

    Concrete products

  • Aba'ad Construction

    Construction

Member firms

FirmRoleFounded
Bahrain AsphaltRoads and asphalt contractor1965
Haji Hassan ReadymixReady-mix concrete1978
Bahrain Precast ConcretePrecast concrete (joint venture)1978
Bahrain BlocksConcrete blocks and paving
Haji Hassan ReinforcementsSteel reinforcement1981
Haji Hassan CranesCrane hire1980
Bahrain PipesPipes1996
Bahrain TanksPolythene tanks1993
KRAH BahrainPipes2011
Isola Solutions W.L.L.Insulation and construction chemicals1985
Arabian Parts CompanyParts1984
Haji Hassan PropertiesProperty
Al A'ali Shopping ComplexShopping centre, Seef1996
EvolveConcrete products2022
Aba'ad ConstructionConstruction2023

Leadership

  • Jalal Al AaliChairman of the Board
  • Ahmed Al NoaimiVice Chairman of the Board
  • Maitham Al AaliBoard Member and Executive Director
  • Ahmed Waheed Al AaliBoard Member
  • Ali Al AaliBoard Member
  • Amal Al AaliBoard Member
  • Husain Al MullaBoard Member
  • Khalil Al AaliBoard Member
  • Kurt MathiasenBoard Member

Past leadership

  1. Haji Hassan Bin Ali Al A'ali - Founder

Where the group operates

BahrainOmanQatarUnited Arab Emirates

Bahrain

Projects only · 4 projects

  • Jasra Interchange - Loop 1 widening
  • Jasra Interchange upgrade Phase 2 - precast bridge parapet barriers
  • Zallaq cycle tracks (sections A-B-C and C-D)
  • South Bahrain loop road Stage 2 (Tunnel J)
Country with an officeProjects only

All projects

ProjectCountrySectorFirmYearDetail
Dukhan Highway (west contract) - pavement worksQatarRoadsBahrain Asphalt2009Paving of the new dual four-lane highway from Shahaniya to the Dukhan industrial area, January 2006 to July 2009, using two 240 t/h asphalt plants set up for the job.
Jasra Interchange - Loop 1 wideningJasra, BahrainRoadsBahrain Asphalt2023Completed April 2023. Included design-and-build micro-piling (300 mm contiguous micro piles) to protect the abutment of the existing bridge.
Jasra Interchange upgrade Phase 2 - precast bridge parapet barriersJasra, BahrainRoadsBahrain Precast Concrete (BPC)Part of the widening of Shaikh Isa Bin Salman Highway and the Jasra interchange upgrade.
Zallaq cycle tracks (sections A-B-C and C-D)Zallaq, BahrainRoadsBahrain AsphaltEmbankment, sub-base preparation, asphalt layers, signs and road marking along Al Zallaq Highway and Gulf of Bahrain Avenue.
South Bahrain loop road Stage 2 (Tunnel J)BahrainRoadsBahrain AsphaltDemolition of the existing carriageway, storm water drainage network, raising of the main road and a cast in-situ concrete underpass.

Sources

  1. Home - Haji Hassan Group, read 23 Nov 2026
  2. History Timeline - Haji Hassan Group, read 23 Nov 2026
  3. Board of Directors - Haji Hassan Group, read 23 Nov 2026
  4. Contact - Haji Hassan Group, read 23 Nov 2026
  5. Group Companies - Haji Hassan Group, read 23 Nov 2026
  6. Projects - Haji Hassan Group, read 23 Nov 2026
  7. Dukhan Highway / Salwa Road - Qatar - Haji Hassan Group, read 23 Nov 2026
  8. Jasra Interchange - Loop 1 Widening - Haji Hassan Group, read 23 Nov 2026
  9. Zallaq Cycle Track - Haji Hassan Group, read 23 Nov 2026
  10. Tunnel-J - Haji Hassan Group, read 23 Nov 2026
  11. Licensed plumbers list - Electricity and Water Authority (EWA), Bahrain, read 23 Nov 2026
  12. Awarded Tenders - March 2016 - Tender Board, Kingdom of Bahrain, read 23 Nov 2026

Similar companies

See all plumbing contractors in Bahrain

More plumbing companies in Bahrain