Dubai Electricity And Water Authority

Overview

Dubai Electricity And Water Authority is classed in the directory as a developer or client based in Dubai, UAE. The sector on record for it is Power & utilities.

As of Nov 2026, it is registered with the Dubai Electricity & Water Authority (DEWA). It is named as the client on 10 contract awards. A phone number is on record for it.

Company type

RoleDeveloper or client
SectorsPower & utilities

Key facts

Licence no.000042
Based inDubai, UAE
Registers and lists1 official register

Official registrations and listings

  • Dubai Electricity & Water Authority (DEWA)

    DEWA enrolled consultants and contractors

    Licence no.000042
    Listed asDUBAI ELECTRICITY AND WATER AUTHORITY
    Firm typeDEWA enrolled contractor
    Listed phone043227954

    Approved for, as the list states

    • Civil & Demolition

    See the list · Checked 17 Nov 2026

Contracts awarded

Contracts awarded
ContractScopeContractorRoleValueDateStatusSource
Hassyan SWRO Phase 2 IWP (272,000 m3/day, about 60 MIGD)30-year water purchase agreement and shareholder agreement; project company DEWA 60% / ACWA 40%; develop, finance, build, operateACWA PowersupplierAED 1,760mUSD 478m7 Nov 2026CheckedWAM, TradeArabia, InfraPPP World
Hassyan SWRO IWP Phase 2 (60 MIGD)Water purchase and shareholder agreements (DEWA 60% / Acwa 40%); development, financing, construction, operationACWA Power / DEWA project company (Hassyan IWP Phase 2)EPCAED 1,760m6 Nov 2026CheckedWAM, Gulf Today
16 new 132kV substations (Al Barsha South 4 & 5, Al Jaddaf, Al Yalayis 1, Al Yufrah 1, Bu Kadra, Jebel Ali 1, Airport City, Me'aisem 1 & 2, Saih Al Dahal, Umm Suqeim 1, Wadi Al Safa 3, Warsan 2 & 4, Zabeel 2) plus 64 km of 132kV cableConstruction of 132kV substations and 132kV underground cable linksNot namedmain contractorc. AED 3,000m21 Jul 2026UnconfirmedDubai Media Office, Saudi Gulf Projects
Hassyan SWRO Phase 2 GRE water transmission pipelines (Project 1)Supply, install, test, commission GRE pipelines and civil/mechanical worksBinladin Contracting Groupmain contractorAED 335.9m19 Jul 2026UnconfirmedGulf Daily News, Saudi Gulf Projects
Critical water infrastructure protection and diversionGRE water pipelines to protect/divert existing services; 20 locations; 24 monthsNot namedmain contractorc. AED 100.8m24 Dec 2025UnconfirmedDubai Media Office, Eye of Riyadh
Strengthening of water transmission network connected to Hassyan water plantSupply, install, test, commission 32 km of 1,200 mm GRE main transmission lines; 18 monthsNot namedmain contractorAED 289m21 Dec 2025UnconfirmedDubai Media Office, Saudi Gulf Projects
Water transmission network efficiency and reliability upgradeGRE pipelines, 7.1 km main transmission line, 20 interconnections; 24 monthsNot namedmain contractorAED 216m18 Dec 2025UnconfirmedDubai Media Office, DEWA
132kV overhead line and cable package linking Shams 400/132kV and Margham 132/33kV substationsDesign, supply, installation, testing, commissioning of 132kV OHL and cableImco Engineering & Constructionmain contractorAED 126.6m15 Apr 2025UnconfirmedMEED
MBR Solar Park Phase 7 (2,000 MW PV + 1,400 MW / 8,400 MWh BESS) transaction advisoryTransaction advisory: Deloitte lead, CMS legal/financial, Sargent & Lundy technicalDeloitte (lead) with CMS and Sargent & Lundyconsultant-Feb 2025CheckedDubai Media Office, MEED
Mohammed bin Rashid Al Maktoum Solar Park Phase 6 (1,800 MW PV IPP)Build, own, operate 1,800MW solar PV IPP; LCOE 1.6215 US cents/kWh; PPA signed Abu Dhabi; DEWA 60% / Masdar 40%Masdarmain contractorAED 5,509mUSD 1.5bn6 Sept 2023CheckedMiddle East Construction News, Arab News

From public announcements, stock exchange filings and press; values as announced.

In the news

Similar companies

More developers & clients in Dubai