Egis Engineering Consultants
Overview
Egis Engineering Consultants L.L.C S.O.C is a Dubai-registered company of Egis, the French architecture, consulting, construction engineering and operating group. DEWA lists it as an enrolled electrical consultant.
Through its UAE companies Egis offers engineering design, programme and project management, construction supervision and operations across transport, urban development, buildings, water and energy. The group's recent Gulf work includes project and construction management for Boubyan Bank's 39-storey headquarters in Kuwait City, completed in November 2026.
Company type
| Role | Consultant |
| Legal form | LLC, single owner company (S.O.C) |
| Sectors | Transport, buildings, urban development, water, energy |
| Services | Engineering consultancy, programme and project management, construction supervision |
Key facts
| Parent | Egis group (France) |
| Group services | Engineering, programme and project management, operations |
Projects
Scroll the table sideways to see every column.
| Project | Location | Year | Client | Role | Scale | Sector | Status |
|---|---|---|---|---|---|---|---|
| Boubyan Bank headquartersBy Egis group | Kuwait City, Kuwait | 2026 | Boubyan National Real Estate Services Company | Project and construction manager | 39 storeys, about 200 m, 75,000 m2+ BUA | Commercial | Completed |
| Dubai Exhibition Centre expansion, Expo City DubaiBy Egis group | Dubai, United Arab Emirates | 2024 | Lead engineering consultant (architecture, structure, MEP, BIM) | AED 10bn expansion; 180,000 m2 of exhibition space | Exhibition | ||
| Natural History Museum Abu DhabiBy Egis group | Abu Dhabi, United Arab Emirates | 2025 | Lead design consultant and construction supervisor (appointed March 2021) | 35,000 m2+ across two buildings | Culture | Completed | |
| Yas Waterworld expansionBy Egis group | Abu Dhabi, United Arab Emirates | 2026 | Miral | Lead design consultant, including integrated MEP design | Leisure | Completed | |
| Al Seef - Contemporary Area, Dubai CreekBy 10 Design (Egis subsidiary) | Dubai, United Arab Emirates | 2017 | Meraas | Concept design to construction supervision (10 Design by Egis) | 104,543 m2 site, 85,000 m2 GFA, two Zabeel House hotels (150 and 200 keys) | Hospitality and retail | Completed |
| UAE Pavilion, Expo 2020 DubaiBy Egis group | Dubai, United Arab Emirates | 2021 | National Media Council | About 20,900 m2 BUA; LEED Platinum | Culture | Completed | |
| Solea residential, Saadiyat IslandBy U+A (Egis subsidiary) | Abu Dhabi, United Arab Emirates | Taraf Holding | Architecture, interior design and landscape (U+A) | Mid-rise residential; construction completion expected about Jan 2028 | Residential |
Official registrations and listings
Ministry of Industry and Advanced Technology (MoIAT)
National ICV certified suppliers
Listed as EGIS ENGINEERING CONSULTANTS See the list · Checked 17 Nov 2026
Dubai Electricity & Water Authority (DEWA)
DEWA enrolled consultants and contractors
Licence no. 665779 Listed as EGIS ENGINEERING CONSULTANTS L.L.C S.O.C See the list · Checked 17 Nov 2026
Abu Dhabi Department of Municipalities and Transport
Engineering Firms with Valid Classification
Licence no. CN-3691440 Listed as EGIS ENGINEERING CONSULTANTS L.L.C S.O.C - BRANCH OF ABU DHABI See the list · Checked 23 Nov 2026
From the company
Company detail
History, leadership and locations of Egis Engineering Consultants.
History
- project
Al Seef Contemporary Area on Dubai Creek completed for Meraas, led by subsidiary 10 Design
- project
Al Seef - Contemporary Area, Dubai Creek, Dubai, United Arab Emirates - Concept design to construction supervision (10 Design by Egis)
- project
Appointed lead design consultant for Natural History Museum Abu Dhabi
- project
UAE Pavilion, Expo 2020 Dubai, Dubai, United Arab Emirates
- project
Named lead engineering consultant for the AED 10bn Dubai Exhibition Centre expansion at Expo City Dubai
- expansion
Opened a UAE central office in the Landmark Building, Dubai Marina, merging six offices including architecture firms U+A and 10 Design
- project
Completed its role on Natural History Museum Abu Dhabi, which opened in late 2025
- project
Yas Waterworld expansion for Miral opened, with Egis UAE as lead design consultant
- project
Boubyan Bank headquarters, Kuwait City, Kuwait - Project and construction manager
Leadership
- Gurminder SagooUAE Managing Director
- Alaa AbuSiamRegional CEO (Egis Middle East)
Where the company operates
United Arab Emirates
Projects only · 6 projects
- Dubai Exhibition Centre expansion, Expo City Dubai
- Natural History Museum Abu Dhabi
- Yas Waterworld expansion
- Al Seef - Contemporary Area, Dubai Creek
- UAE Pavilion, Expo 2020 Dubai
- Solea residential, Saadiyat Island
Kuwait
Projects only · 1 project
- Boubyan Bank headquarters
Sources
- Egis - Creating a sustainable future - Egis, read 22 Nov 2026
- Programme and project management - Egis - Egis, read 22 Nov 2026
- DEWA enrolled consultants and contractors - Dubai Electricity & Water Authority (DEWA), read 17 Nov 2026
- Egis Delivers Boubyan Bank's New Headquarters in Kuwait - Egis, read 22 Nov 2026
- National ICV certified suppliers - UAE Ministry of Industry and Advanced Technology, read 17 Nov 2026
- Egis to lead engineering and architectural consultancy for the Dubai Exhibition Centre expansion - Egis, read 23 Nov 2026
- Egis delivers lead design and construction supervision for Natural History Museum Abu Dhabi - Egis, read 23 Nov 2026
- Egis delivers the expansion of Yas Waterworld - Egis, read 23 Nov 2026
- Egis unveils new UAE central office - Egis, read 23 Nov 2026
- The Contemporary Area of Al Seef - Egis, read 23 Nov 2026
- The UAE Pavilion at Expo 2020 - Egis, read 23 Nov 2026
- Solea, Saadiyat Island - Egis, read 23 Nov 2026