Elsewedy Electric Power Systems Projects W.L.L. Abu Dhabi Branch
Elsewedy PSP - part of Elsewedy Electric
Phone
+971 2 643 4648Website
elsewedyelectric.comOverview
Elsewedy Electric Power Systems Projects (Elsewedy PSP) is one of the engineering and construction arms that the Egyptian group Elsewedy Electric uses to deliver turnkey power, utility and infrastructure projects in the UAE. This record is its Abu Dhabi branch. Alongside Elsewedy Power and Rowad Modern Engineering, PSP carries the group's UAE EPC work in power generation, renewables, transmission and distribution, water plants and networks, and civil and public works.
The wider group says it has worked in the UAE for more than two decades and employs over 1,500 people there, with four production and service facilities, including a package substation plant in Al Ain, and seven offices. The UAE project the group features most prominently is the 815 MW Al Aweer H Phase IV simple cycle plant for DEWA, built as a turnkey EPC job by a consortium. Group-wide, Elsewedy Electric reports more than 21,000 staff and revenue above USD 5.7 billion in 2025.
Company type
| Role | Contractor |
| Legal form | W.L.L. (Abu Dhabi branch) |
| Sectors | Power generation, renewables, transmission and distribution, water and wastewater, infrastructure |
| Services | EPC of power plants, substations, overhead lines and underground cabling, balance of plant works, water plants and networks, civil and electromechanical works |
Key facts
| Parent | Elsewedy Electric (Cairo, Egypt) |
| Group UAE staff | 1,500+ |
| Group UAE footprint | 4 production and service facilities, 7 offices |
| Group revenue (2025) | USD 5.7bn+ |
Projects
Scroll the table sideways to see every column.
| Project | Location | Client | Role | Scale | Sector |
|---|---|---|---|---|---|
| Al Aweer H Station Phase IV (815 MW simple cycle)By Elsewedy Electric (group) | Dubai, United Arab Emirates | Dubai Electricity & Water Authority | Turnkey EPC - consortium member | 815 MW, three Siemens gas turbines; USD 302 million | Power |
Official registrations and listings
Ministry of Industry and Advanced Technology (MoIAT)
National ICV certified suppliers
Listed as ELSEWEDY ELECTRIC POWER SYSTEMS PROJECTS W.L.L. ABU DHABI BRANCH See the list · Checked 17 Nov 2026
Company detail
History of Elsewedy Electric Power Systems Projects W.L.L. Abu Dhabi Branch.
History
- milestone
Elsewedy family starts an electrical equipment trading business in Cairo (group origin)
Sources
- UAE - Elsewedy Electric - Elsewedy Electric, read 23 Nov 2026
- Al Aweer 815 MW SCPP - UAE - Elsewedy Electric, read 23 Nov 2026
- About us - Elsewedy Electric, read 23 Nov 2026
- National ICV certified suppliers - UAE Ministry of Industry and Advanced Technology, read 17 Nov 2026