Enoia Study and Technical Company S.A. - Abu Dhabi
Overview
ENOIA Study and Technical Company S.A. is the Abu Dhabi office of ENOIA, a multi-disciplinary engineering and project management group founded in Greece in 1987. The group works in energy (oil and gas, power and renewables), industrial and chemical plants, mining and metals, and water and infrastructure, and runs engineering centres in Athens, Cairo, Dubai and Chennai with local offices in Abu Dhabi and Beirut.
Its regional headquarters is ENOIA Dynaflow in Dubai. Group projects listed on its site include pipeline rehabilitation at In Amenas for Sonatrach in Algeria, a methanol receiving and storage terminal and a chemical preparation plant in Greece, a fuel storage terminal, the Vassilikos Energy Center fire-fighting system in Cyprus and a green hydrogen innovation hub. The group's management system is certified to ISO 9001, ISO 14001 and ISO 45001.
Company type
| Role | Engineering consultant |
| Legal form | S.A. (branch office, Abu Dhabi) |
| Sectors | Oil and gas, power, renewables, industrial, mining, water and infrastructure |
| Services | Multi-disciplinary engineering, FEED and detailed design, project management |
Key facts
| Group founded | 1987, Greece (group figure) |
| Abu Dhabi entity formed | 2009 |
| Group offices | Athens, Cairo, Dubai, Chennai; local offices Abu Dhabi and Beirut (group figure) |
| Certifications | ISO 9001:2015, ISO 14001:2015, ISO 45001:2018 (group) |
Official registrations and listings
Ministry of Industry and Advanced Technology (MoIAT)
National ICV certified suppliers
Listed as Enoia Study and Technical Company S.A. - Abu Dhabi See the list · Checked 17 Nov 2026
Company detail
History, locations, offices and projects of Enoia Study and Technical Company S.A. - Abu Dhabi.
History
- milestone
ENOIA S.A. formed in Greece
- expansion
Dynaflow International formed in the UAE (now ENOIA Dynaflow, regional HQ)
- project
Methanol terminal receiving facilities, storage and truck loading, Greece - Engineering
- project
Engineering Services for Motor Oil Refineries, Greece - Engineering consultant
- project
Repsol Oil Operations El Sharara Development Water Injection Project, Libya - Engineering consultant
- project
Refinery Truck Loading Terminal, Greece - Engineering consultant
- project
Nafoora Gas Lift System Capacity Expansion & Gas Utilization, Libya - Engineering consultant
- project
Compagnie des Petroles Total Libya Mabrouk Project-Phase 4, Libya - Engineering consultant
- project
Nuayyim ASL Crude Increment Facilities, Saudi Arabia - Engineering consultant
- deal
ENOIA S.A. acquired
- project
Construction Supervision for Water and Sanitation Projects in 5 Main Centers in Beheira Government (Population 4,000,000), Egypt - Engineering consultant
- expansion
ENOIA Abu Dhabi formed
- project
Yanbu 2 Power & Water Plant Seawater Cooling Pipelines Network & Marine Facilities, Saudi Arabia - Engineering consultant
- project
Marafiq Jubail Industrial Water Treatment Plant # 8 Expansion - Stage III, Saudi Arabia - Engineering consultant
- project
Skouries Mineral Processing Plant, Greece - Engineering consultant
- project
NC-115 & NC-186 Gas Utilization - Phase II Gas Compression and Treatment Facilities, Libya - Engineering consultant
- deal
Acquires CEB in Egypt, renamed ENOIA Utilities Consulting Engineering
- project
Marafiq Yanbu Industrial Water Treatment Plant - II, Saudi Arabia - Engineering consultant
- project
Berkit Al Sabah Water Treatment Plant (Capacity 68000 M3/day), Egypt - Engineering consultant
- project
Belbees Water Treatment Plant (100.000 M3/d) and Complementary Works, Egypt - Engineering consultant
- project
10th Ramadan Water Project, Egypt - Engineering consultant
- project
Sheikh Zayed Water Project, Egypt - Engineering consultant
- project
ISSIP 1 Program (KfW Funded) - Kafer El Shaikh 7 Towns Sewage Collection and Treatment Systems, Egypt - Engineering consultant
- project
I/R GOSP Simulation and Optimization Study, Libya - Engineering consultant
- project
Ceyhan Terminal Expansion, Turkey - Engineering consultant
- project
VTTI Vassilikos Oil Terminal & Jetty, Cyprus - Engineering consultant
- deal
Acquires BBSPL in India, renamed ENOIA Babcock Borsig
- project
10" Gas Pipeline Condensates Analysis & Handling Study, Libya - Engineering consultant
- project
Sea Cooling Water System Upgrade at Motor Oil Hellas Corinth Refineries, Greece - Engineering consultant
- project
Sustainable Rural Sanitation Services Program (SRSSP) - Project Management Consultancy (World Bank Funded), Egypt - Engineering consultant
- rebrand
Group companies brought together under one ENOIA brand
- project
Carbon Holdings Industrial Project Services (CHIPS) Tank Farm, Jetty and Pipelines (Port Area Facility), Egypt - Engineering consultant
- project
FEED for Offsites, Wellhead Facilities, Gathering System & Export Line for Kurdamir & Topkhana Development Project, Iraq - Engineering consultant
- project
Metsovitiko Hydroelectric Plant, Greece - Engineering consultant
- project
New chemical preparation plant, Greece - Engineering
- project
Beet Sugar Factory, Al-Minya, Egypt - Engineering consultant
- project
New EPS Plant, Greece - Engineering consultant
- project
OH1 In Amenas pipeline rehabilitation, In Amenas, Algeria - Engineering
- project
"Argo" FSRU, Greece - Engineering consultant
- project
General Engineering Services for HELPE Refineries, Greece - Engineering consultant
- project
ROH1 In Amenas pipeline rehabilitation, In Amenas, Algeria - Engineering
- project
Expansion of Olympias Mineral Processing Plant, Greece - Engineering consultant
Where the company operates
Egypt
1 office · 11 projects
- CairoENOIA Utilities Consulting Engineers S.A.E, Osman Towers, Tower 2, Kornish Al Nile, Maadi
- Beet Sugar Factory, Al-Minya
- Carbon Holdings Industrial Project Services (CHIPS) Tank Farm, Jetty and Pipelines (Port Area Facility)
- Construction Supervision for Water and Sanitation Projects in 5 Main Centers in Beheira Government (Population 4,000,000)
- Rehabilitation and Extension of the El-Abbassa Water Supply System (El-Sharkia Governorate)
- Berkit Al Sabah Water Treatment Plant (Capacity 68000 M3/day)
- Belbees Water Treatment Plant (100.000 M3/d) and Complementary Works
- 10th Ramadan Water Project
- Sheikh Zayed Water Project
- ISSIP 1 Program (KfW Funded) - Kafer El Shaikh 7 Towns Sewage Collection and Treatment Systems
- Cairo - East Bank Master Plan & Gabal Al Asfar WWTP Expansion
- Sustainable Rural Sanitation Services Program (SRSSP) - Project Management Consultancy (World Bank Funded)
Greece
1 office · 14 projects
- AthensENOIA S.A., 62 Kifissias Avenue, Maroussi 15125
- Methanol terminal receiving facilities, storage and truck loading
- New chemical preparation plant
- Agios Efstratios hybrid energy system
- Expansion of Olympias Mineral Processing Plant
- New EPS Plant
- Engineering Services for Motor Oil Refineries
- General Engineering Services for HELPE Refineries
- Metsovitiko Hydroelectric Plant
- "Argo" FSRU
- Thessaloniki Industrial Complex Polypropylene Plant
- Sea Cooling Water System Upgrade at Motor Oil Hellas Corinth Refineries
- Skouries Mineral Processing Plant
India
1 office · 1 project
- ChennaiENOIA Babcock Borsig Private Limited, 3rd Floor, Apex Plaza, 3 Nungambakkam High Road
- GTEC's 655 MW Combined Cycle Power Station
Lebanon
1 office
- BeirutENOIA SAL, Tabco Building 10th Floor, Omar Daouk Street, Downtown
United Arab Emirates
1 office · 2 projects
- DubaiENOIA Dynaflow LLC, Office No. 2, 1st Floor, Bin Sougat Building, Umm Ramool, PO Box 28441
- 40 Migd-Med Desalination Plant for Sharjah Electricity and Water Authority-Sewa
- Abu Dhabi Crude Oil Pipeline - Habshan to Fujairah
Algeria
Projects only · 2 projects
- OH1 In Amenas pipeline rehabilitation
- ROH1 In Amenas pipeline rehabilitation
Canada
Projects only · 1 project
- Power Plant - Syncrude, Canada
Cyprus
Projects only · 2 projects
- Vassilikos Energy Center fire-fighting system
- VTTI Vassilikos Oil Terminal & Jetty
Iraq
Projects only · 1 project
- FEED for Offsites, Wellhead Facilities, Gathering System & Export Line for Kurdamir & Topkhana Development Project
Kuwait
Projects only · 4 projects
- Clean Fuels Project (CFP) - MAB1 & MAA - Kuwait
- New Refinery Project (NRP) - Kuwait
- Cross-country pipeline to Doha West Power Station, Kuwait
- Pipeline Development for New Gathering Centre (GC-16) at KOC, Kuwait
Libya
Projects only · 7 projects
- Repsol Oil Operations El Sharara Development Water Injection Project
- El Sharara Development Project - Zawia Terminal
- 10" Gas Pipeline Condensates Analysis & Handling Study
- NC-115 & NC-186 Gas Utilization - Phase II Gas Compression and Treatment Facilities
- Nafoora Gas Lift System Capacity Expansion & Gas Utilization
- I/R GOSP Simulation and Optimization Study
- Compagnie des Petroles Total Libya Mabrouk Project-Phase 4
Malaysia
Projects only · 2 projects
- Power Plant - Rapid, Malaysia
- Steam Generation Plant at Malaysian LNG Facility, Malaysia
Qatar
Projects only · 2 projects
- Ras Laffan Common Cooling Water Project
- Waste Water Treatment Plant for QAFCO, Qatar
Saudi Arabia
Projects only · 6 projects
- Saudi Elastomers Project (SEP) - Halobutyl Plant
- Tasnee Petrochemical Complex in Jubail
- Yanbu 2 Power & Water Plant Seawater Cooling Pipelines Network & Marine Facilities
- Marafiq Yanbu Industrial Water Treatment Plant - II
- Marafiq Jubail Industrial Water Treatment Plant # 8 Expansion - Stage III
- Nuayyim ASL Crude Increment Facilities
Turkey
Projects only · 1 project
- Ceyhan Terminal Expansion
Vietnam
Projects only · 1 project
- Nghi Son Power Plant, Vietnam
Office directory
| City | Country | Address | Phone |
|---|---|---|---|
| Dubai | United Arab Emirates | ENOIA Dynaflow LLC, Office No. 2, 1st Floor, Bin Sougat Building, Umm Ramool, PO Box 28441 | +971 4 211 0800 |
| Athens | Greece | ENOIA S.A., 62 Kifissias Avenue, Maroussi 15125 | +30 210 612 3663 |
| Cairo | Egypt | ENOIA Utilities Consulting Engineers S.A.E, Osman Towers, Tower 2, Kornish Al Nile, Maadi | +20 2 2524 3535 |
| Chennai | India | ENOIA Babcock Borsig Private Limited, 3rd Floor, Apex Plaza, 3 Nungambakkam High Road | +91 44 6622 4555 |
| Beirut | Lebanon | ENOIA SAL, Tabco Building 10th Floor, Omar Daouk Street, Downtown | +961 1 375107 |
| No office matches. | |||
5 offices
All projects
| Project | Country | Sector | Firm | Year | Detail |
|---|---|---|---|---|---|
| OH1 In Amenas pipeline rehabilitation | In Amenas, Algeria | Oil and gas | ENOIA group | 2021 | |
| ROH1 In Amenas pipeline rehabilitation | In Amenas, Algeria | Oil and gas | ENOIA group | 2025 | |
| Methanol terminal receiving facilities, storage and truck loading | Greece | Industrial | ENOIA group | 2000 | |
| New chemical preparation plant | Greece | Industrial | ENOIA group | 2019 | |
| Fuel storage terminal | Oil and gas | ENOIA group | |||
| Vassilikos Energy Center fire-fighting system | Cyprus | Energy | ENOIA group | ||
| Ballast water treatment retrofit | Marine | ENOIA group | |||
| Green Hydrogen Innovation Hub (H2 Hub) | Renewables | ENOIA group | |||
| Agios Efstratios hybrid energy system | Greece | Renewables | ENOIA group | ||
| Expansion of Olympias Mineral Processing Plant | Greece | Mining | ENOIA group | 2025 | Scope: Detailed Engineering, Project Management, Construction Management & Supervision Services |
| Beet Sugar Factory, Al-Minya | Egypt | Industrial | ENOIA group | 2019-2022 | Scope: Basic & Detail Design, Project Management & Construction Supervision |
| New EPS Plant | Greece | Industrial | ENOIA group | 2019-2023 | |
| Engineering Services for Motor Oil Refineries | Greece | Oil and gas | ENOIA group | 2000 | |
| General Engineering Services for HELPE Refineries | Greece | Oil and gas | ENOIA group | 2024 | Scope: As applicable per project: Feasibility Study, FEED, Basic and Detailed Engineering Design |
| Metsovitiko Hydroelectric Plant | Greece | Power and energy | ENOIA group | 2018-2019 | Scope: Detailed Engineering |
| "Argo" FSRU | Greece | Oil and gas | ENOIA group | 2022 | Scope: Owner’s Engineer |
| Saudi Elastomers Project (SEP) - Halobutyl Plant | Saudi Arabia | Industrial | ENOIA group | ||
| Clean Fuels Project (CFP) - MAB1 & MAA - Kuwait | Kuwait | Oil and gas | ENOIA group | ||
| New Refinery Project (NRP) - Kuwait | Kuwait | Oil and gas | ENOIA group | ||
| Ras Laffan Common Cooling Water Project | Qatar | Water and wastewater | ENOIA group | Scope: Third Party FRP Consultancy Services Stress Analysis Finite Element Analysis Pipe Support Design | |
| Tasnee Petrochemical Complex in Jubail | Saudi Arabia | Industrial | ENOIA group | ||
| Thessaloniki Industrial Complex Polypropylene Plant | Greece | Industrial | ENOIA group | ||
| Yanbu 2 Power & Water Plant Seawater Cooling Pipelines Network & Marine Facilities | Saudi Arabia | Water and wastewater | ENOIA group | 2009-2011 | |
| Waste Water Treatment Plant for QAFCO, Qatar | Qatar | Water and wastewater | ENOIA group | ||
| Marafiq Yanbu Industrial Water Treatment Plant - II | Saudi Arabia | Water and wastewater | ENOIA group | 2010-2012 | Scope: Detailed Engineering (all disciplines) |
| Marafiq Jubail Industrial Water Treatment Plant # 8 Expansion - Stage III | Saudi Arabia | Water and wastewater | ENOIA group | 2009-2011 | Scope: Detailed Engineering (all disciplines) |
| Sea Cooling Water System Upgrade at Motor Oil Hellas Corinth Refineries | Greece | Water and wastewater | ENOIA group | 2014-2015 | Scope: Feasibility, Process Design and Cost Estimation of different alternatives. |
| Carbon Holdings Industrial Project Services (CHIPS) Tank Farm, Jetty and Pipelines (Port Area Facility) | Egypt | Oil and gas | ENOIA group | 2016 | Scope: Basic Design, Front End Engineering Design (FEED) |
| Skouries Mineral Processing Plant | Greece | Mining | ENOIA group | 2009 | |
| Construction Supervision for Water and Sanitation Projects in 5 Main Centers in Beheira Government (Population 4,000,000) | Egypt | Water and wastewater | ENOIA group | 2008-2009 | Scope: Construction supervision |
| Rehabilitation and Extension of the El-Abbassa Water Supply System (El-Sharkia Governorate) | Egypt | Water and wastewater | ENOIA group | ||
| Berkit Al Sabah Water Treatment Plant (Capacity 68000 M3/day) | Egypt | Water and wastewater | ENOIA group | 2010-2011 | Scope: Detailed engineering |
| Belbees Water Treatment Plant (100.000 M3/d) and Complementary Works | Egypt | Water and wastewater | ENOIA group | 2010-2011 | Scope: Detailed engineering |
| 10th Ramadan Water Project | Egypt | Water and wastewater | ENOIA group | 2010-2011 | Scope: Detailed engineering: Hydraulic, Mechanical, Structural, Control, Monitoring, Water Hammer calculations |
| FEED for Offsites, Wellhead Facilities, Gathering System & Export Line for Kurdamir & Topkhana Development Project | Iraq | Oil and gas | ENOIA group | 2016 | Scope: Front - End Engineering Design (FEED) |
| Sheikh Zayed Water Project | Egypt | Water and wastewater | ENOIA group | 2010-2011 | Scope: Detailed engineering |
| ISSIP 1 Program (KfW Funded) - Kafer El Shaikh 7 Towns Sewage Collection and Treatment Systems | Egypt | Water and wastewater | ENOIA group | 2010-2011 | Scope: Detailed engineering Construction supervision |
| 40 Migd-Med Desalination Plant for Sharjah Electricity and Water Authority-Sewa | United Arab Emirates | Water and wastewater | ENOIA group | ||
| Cairo - East Bank Master Plan & Gabal Al Asfar WWTP Expansion | Egypt | Water and wastewater | ENOIA group | Scope: Master plan Feasibility study Detailed design Preparation of Tender Documents | |
| Sustainable Rural Sanitation Services Program (SRSSP) - Project Management Consultancy (World Bank Funded) | Egypt | Water and wastewater | ENOIA group | 2015 | |
| Power Plant - Syncrude, Canada | Canada | Oil and gas | ENOIA group | ||
| Power Plant - Rapid, Malaysia | Malaysia | Power and energy | ENOIA group | ||
| Nghi Son Power Plant, Vietnam | Vietnam | Power and energy | ENOIA group | ||
| Steam Generation Plant at Malaysian LNG Facility, Malaysia | Malaysia | Oil and gas | ENOIA group | ||
| GTEC's 655 MW Combined Cycle Power Station | India | Power and energy | ENOIA group | ||
| Repsol Oil Operations El Sharara Development Water Injection Project | Libya | Water and wastewater | ENOIA group | 2000-2003 | Scope: Basic Design, Detailed Engineering, Operating Manual |
| Refinery Truck Loading Terminal | Greece | Oil and gas | ENOIA group | 2001-2003 | |
| El Sharara Development Project - Zawia Terminal | Libya | Oil and gas | ENOIA group | ||
| Cross-country pipeline to Doha West Power Station, Kuwait | Kuwait | Oil and gas | ENOIA group | ||
| Natural Gas Networks at Several Cities in Greece | Greece | Oil and gas | ENOIA group | ||
| Ceyhan Terminal Expansion | Turkey | Oil and gas | ENOIA group | 2012-2014 | |
| 10" Gas Pipeline Condensates Analysis & Handling Study | Libya | Oil and gas | ENOIA group | 2013-2014 | |
| Pipeline Development for New Gathering Centre (GC-16) at KOC, Kuwait | Kuwait | Oil and gas | ENOIA group | ||
| Abu Dhabi Crude Oil Pipeline - Habshan to Fujairah | United Arab Emirates | Oil and gas | ENOIA group | ||
| NC-115 & NC-186 Gas Utilization - Phase II Gas Compression and Treatment Facilities | Libya | Oil and gas | ENOIA group | 2009-2010 | |
| Nafoora Gas Lift System Capacity Expansion & Gas Utilization | Libya | Oil and gas | ENOIA group | 2002-2004 | Scope: Basic Design, Detailed Engineering, Procurement Services and Support during Construction |
| I/R GOSP Simulation and Optimization Study | Libya | Oil and gas | ENOIA group | 2010-2011 | |
| Compagnie des Petroles Total Libya Mabrouk Project-Phase 4 | Libya | Oil and gas | ENOIA group | 2004-2006 | |
| VTTI Vassilikos Oil Terminal & Jetty | Cyprus | Oil and gas | ENOIA group | 2012-2014 | |
| Nuayyim ASL Crude Increment Facilities | Saudi Arabia | Oil and gas | ENOIA group | 2006-2009 | Scope: Basic Design, Detailed Engineering, Procurement Services, Construction Follow up |
Sources
- ENOIA - home - ENOIA, read 22 Nov 2026
- About ENOIA - overview, history, quality policy - ENOIA, read 22 Nov 2026
- Contact us - ENOIA, read 22 Nov 2026
- Projects - ENOIA, read 22 Nov 2026
- National ICV certified suppliers - UAE Ministry of Industry and Advanced Technology, read 17 Nov 2026
- Vassilikos Energy Center Ff System - ENOIA, read 23 Nov 2026
- Expansion OF Olympias Mineral Processing Plant - ENOIA, read 23 Nov 2026
- Ballast Water Treatment Retrofit - ENOIA, read 23 Nov 2026
- BEET SUGAR Factory, Al-minya, EGYPT - ENOIA, read 23 Nov 2026
- New EPS Plant - ENOIA, read 23 Nov 2026
- Engineering Services for MOTOR Oil Refineries - ENOIA, read 23 Nov 2026
- General Engineeering Services for HELPE Refineries - ENOIA, read 23 Nov 2026
- Metsovitiko Hydroelectric Plant - ENOIA, read 23 Nov 2026
- New Chemical Preparation Plant - ENOIA, read 23 Nov 2026
- AGIOS Efstratios Hybrid Energy System - ENOIA, read 23 Nov 2026
- "argo" FSRU - ENOIA, read 23 Nov 2026
- GREEN Hydrogen Innovation Hub - H2 Hub - ENOIA, read 23 Nov 2026
- FUEL Storage Terminal - ENOIA, read 23 Nov 2026
- ROH1 IN Amenas Pipeline Rehabilitation Project - ENOIA, read 23 Nov 2026
- OH1 IN Amenas Pipeline Rehabilitation Project - ENOIA, read 23 Nov 2026
- Methanol Terminal Receiving Facilities, Storage & TRUCK Loading - ENOIA, read 23 Nov 2026
- SAUDI Elastomers Project (sep) - Halobutyl Plant - ENOIA, read 23 Nov 2026
- CLEAN FUELS Project (cfp) - MAB1 & MAA - Kuwait - ENOIA, read 23 Nov 2026
- New Refinery Project (nrp) - Kuwait - ENOIA, read 23 Nov 2026
- RAS Laffan Common Cooling Water Project - ENOIA, read 23 Nov 2026
- Tasnee Petrochemical Complex IN Jubail - ENOIA, read 23 Nov 2026
- Thessaloniki Industrial Complex Polypropylene Plant - ENOIA, read 23 Nov 2026
- YANBU 2 Power & Water Plant Seawater Cooling Pipelines Network & Marine Facilities - ENOIA, read 23 Nov 2026
- WASTE Water Treatment Plant for Qafco, QATAR - ENOIA, read 23 Nov 2026
- Marafiq YANBU Industrial Water Treatment Plantp - II - ENOIA, read 23 Nov 2026
- Marafiq Jubail Industrial Water Treatment Plant # 8 Expansion - STAGE III - ENOIA, read 23 Nov 2026
- SEA Cooling Water System Upgrade AT MOTOR Oil Hellas Corinth Refineries - ENOIA, read 23 Nov 2026
- Carbon Holdings Industrial Project Services (chips) TANK Farm, JETTY and Pipelines (port AREA Facility) - ENOIA, read 23 Nov 2026
- Skouries Mineral Processing Plant - ENOIA, read 23 Nov 2026
- Construction Supervision for Water and Sanitation Projects IN 5 MAIN Centers IN Beheira Government (population 4,000,000) - ENOIA, read 23 Nov 2026
- Rehabilitation and Extension OF the El-abbassa Water Supply System (el-sharkia Governorate) - ENOIA, read 23 Nov 2026
- Berkit AL SABAH Water Treatment Plant (capacity 68000 M3/day) - ENOIA, read 23 Nov 2026
- Belbees Water Treatment Plant (100.000 M3/d) and Complementary WORKS - ENOIA, read 23 Nov 2026
- 10TH Ramadan Water Project - ENOIA, read 23 Nov 2026
- FEED for Offsites, Wellhead Facilities, Gathering System & Export Line for Kurdamir & Topkhana Development Project - ENOIA, read 23 Nov 2026
- Sheikh ZAYED Water Project - ENOIA, read 23 Nov 2026
- ISSIP 1 Program (kfw Funded) - KAFER EL Shaikh 7 TOWNS Sewage Collection and Treatment Systems - ENOIA, read 23 Nov 2026
- 40 Migd-med Desalination Plant for Sharjah Electricity and Water Authority-sewa - ENOIA, read 23 Nov 2026
- CAIRO - EAST BANK Master PLAN & GABAL AL ASFAR WWTP Expansion - ENOIA, read 23 Nov 2026
- Sustainable RURAL Sanitation Services Program (srssp) - Project Management Consultancy (world BANK Funded) - ENOIA, read 23 Nov 2026
- Power Plant - Syncrude, Canada - ENOIA, read 23 Nov 2026
- Power Plant - Rapid, Malaysia - ENOIA, read 23 Nov 2026
- NGHI SON Power Plant, Vietnam - ENOIA, read 23 Nov 2026
- STEAM Generation Plant AT Malaysian LNG Facility, Malaysia - ENOIA, read 23 Nov 2026
- GTEC's 655 MW Combined CYCLE Power Station - ENOIA, read 23 Nov 2026
- Repsol Oil Operations EL Sharara Development Water Injection Project - ENOIA, read 23 Nov 2026
- Refinery TRUCK Loading Terminal - ENOIA, read 23 Nov 2026
- EL Sharara Development Project - ZAWIA Terminal - ENOIA, read 23 Nov 2026
- Cross-country Pipeline for TO DOHA WEST Power Station, Kuwait - ENOIA, read 23 Nov 2026
- Natural Gas Networks AT Several Cities IN Greece - ENOIA, read 23 Nov 2026
- Ceyhan Terminal Expansion - ENOIA, read 23 Nov 2026
- 10" Gas Pipeline Condensates Analysis & Handling STUDY - ENOIA, read 23 Nov 2026
- Pipeline Development for New Gathering Centre (gc-16) AT Koc, Kuwait - ENOIA, read 23 Nov 2026
- ABU DHABI CRUDE Oil Pipeline - Habshan TO Fujairah - ENOIA, read 23 Nov 2026
- Nc-115 & Nc-186 Gas Utlization - PHASE II Gas Compression and Treatment Facilities - ENOIA, read 23 Nov 2026
- Nafoora Gas LIFT System Capacity Expansion & Gas Utilization - ENOIA, read 23 Nov 2026
- I/r GOSP Simulation and Optimization STUDY - ENOIA, read 23 Nov 2026
- Compagnie DES Petroles TOTAL LIBYA Mabrouk Project-phase 4 - ENOIA, read 23 Nov 2026
- VTTI Vassilikos Oil Terminal & JETTY - ENOIA, read 23 Nov 2026
- Nuayyim ASL CRUDE Increment Facilities - ENOIA, read 23 Nov 2026