Heavy Engineering Industries & Shipbuilding Co.
Formerly Kuwait Shipbuilding & Repairyard Co. (KSRC)
Overview
Heavy Engineering Industries & Shipbuilding Co. (HEISCO) is a Kuwaiti EPC contractor and shipyard operator listed on the Premier Market of Boursa Kuwait. It started in 1974 as Kuwait Shipbuilding & Repairyard Co., a maritime business, and took its present name in 2003 as it moved into engineering, procurement and construction work.
Its work now spans oil and gas construction, industrial maintenance, process equipment fabrication, galvanizing, testing and calibration, scaffolding and shipbuilding and repair at its Shuwaikh Port yard. Main clients named on its site are Kuwait Oil Company, KNPC, KIPIC, the Ministry of Electricity and Water and, in Saudi Arabia, Saudi Aramco and Saudi Electricity Co.
HEISCO runs a branch in Al Khobar, Saudi Arabia, and owns Gulf Dredging & General Contracting Co., a dredging and marine contractor, plus a manpower supply company and an engineering design office in Chennai, India.
Company type
| Role | Main contractor |
| Legal form | Kuwaiti public shareholding company (K.S.C.P.), listed on Boursa Kuwait Premier Market |
| Sectors | Oil and gas, refining and petrochemicals, power and desalination, marine and shipbuilding |
| Services | EPC construction, industrial maintenance, fabrication, shipbuilding and ship repair, dredging (subsidiary), NDT and calibration |
Key facts
| Founded | 1974, Kuwait (as Kuwait Shipbuilding & Repairyard Co.) |
| Certifications | ISO 9001:2015, ISO 45001:2018, ISO 14001:2015; ASME U, U2, S, PP and NB R stamps |
| Classification | CAPT Category 1 in civil, mechanical and electrical works |
| Listing | Boursa Kuwait, Premier Market |
| Offices | Kuwait (Shuwaikh Port head office, Mina Abdullah oil and gas base); branch in Al Khobar, Saudi Arabia; engineering office in Chennai, India |
Official registrations and listings
Public Authority for Industry (PAI), Kuwait
Listed as Heavy Engineering Industries & Shipbuilding Co. Industrial Guide of Kuwait 2022
Licence no. PAI industrial licence 10142 See the list · Checked 21 Nov 2026
Industrial Guide of Kuwait 2022
Licence no. PAI industrial licence 10981 See the list · Checked 21 Nov 2026
Ministry of Electricity, Water and Renewable Energy (MEW), Kuwait
Concluded contracts register
See the list · Checked 21 Nov 2026
Contracts on public award lists
Named in "Concluded contracts register" of the Ministry of Electricity, Water and Renewable Energy, Kuwait
| Contract | Year |
|---|---|
| Steam turbine and boiler repair/rehabilitation | 2024 |
Titles as the award lists print them.
In the news
Company detail
History, structure, leadership, locations, offices and projects of Heavy Engineering Industries & Shipbuilding Co..
History
- milestone
Established as Kuwait Shipbuilding & Repairyard Co. (KSRC), a shipping and maritime business
- deal
Gulf Dredging & General Contracting Co., later a HEISCO subsidiary, founded as a joint venture of the Kuwaiti government and Ballast Nedam
- rebrand
Renamed Heavy Engineering Industries & Shipbuilding Co. and repositioned as an EPC contractor
- expansion
Sets up HEISCO for Technical Specialized Manpower Supply Co.
- project
North pier upgrade for crude and product exports, Mina Al-Ahmadi Refinery, Mina Al-Ahmadi, Kuwait - Contractor
- project
Mechanical maintenance services, Mina Abdullah Refinery, Mina Abdullah, Kuwait - Contractor
- milestone
Marks its 50th anniversary
- project
Rehabilitation and upgrade of steam boilers and control systems, Doha West Power and Water Distillation Station, Kuwait - Consortium partner
- project
Boiler rehabilitation and control system replacement, Az-Zour South Power and Water Distillation Station, Kuwait - Consortium partner
- project
Upgrade of gas and condensate network, East Kuwait Area I, Kuwait - Contractor
- project
Safety and SCADA systems for Jurassic wells, North Kuwait, Kuwait - Contractor
- project
Jurassic Production Facility, North Kuwait - civil, structural, mechanical, piping and E&I works, Kuwait - Subcontractor to the main contractor
- project
Nitrogen supply pipeline to KNPC refineries, Kuwait - Subcontractor to the main contractor
- project
Revamp of boilers 1-6, unit 29, Mina Al-Ahmadi Refinery, Mina Al-Ahmadi, Kuwait - Subcontractor to the main contractor
- project
Rehabilitation of steam turbines and generators for 8 units, Sabiya power and water station, Sabiya, Kuwait - Subcontractor to the main contractor
- project
Repair and life extension of fuel oil tanks and fuel lines, Az-Zour South station, Az-Zour, Kuwait - Contractor
- project
Low-NOx burner replacement for process heaters, Mina Al-Ahmadi Refinery (EPC), Mina Al-Ahmadi, Kuwait - EPC contractor
- project
Sea cooling towers stages 5 and 6 - civil and structural works, Kuwait - Contractor
- project
Amine regenerator tower, reboiler and piping replacement, Mina Abdullah Refinery, Mina Abdullah, Kuwait - Contractor
- project
Power lines feeding Al Khairan Power Plant and fuel receiving systems at Az-Zour Power Plant, Kuwait - Contractor
Group structure
Subsidiaries
- Gulf Dredging & General Contracting Co. K.S.C. (Closed)
Dredging, marine and civil construction · Kuwait
- HEISCO for Technical Specialized Manpower Supply Co. W.L.L.
Technical manpower supply · Kuwait
- HEISCO Engineering India Pvt. Ltd.
Design and engineering services · Chennai, India
Member firms
| Firm | Role | Founded | Base | Footprint |
|---|---|---|---|---|
| Gulf Dredging & General Contracting Co. K.S.C. (Closed) | Dredging, marine and civil construction | 1975 | Kuwait | Branches in Saudi Arabia and Iraq; active in Qatar and Oman |
| HEISCO for Technical Specialized Manpower Supply Co. W.L.L. | Technical manpower supply | 2019 | Kuwait | |
| HEISCO Engineering India Pvt. Ltd. | Design and engineering services | Chennai, India |
Leadership
- Marzouq Nasser Mohammed Al-KharafiChairman
- Malik Maher Abdallah MarafieVice Chairman
Where the company operates
Kuwait
2 offices · 21 projects
- Kuwait (Shuwaikh Port)P.O. Box 21998, Safat 13080
- Mina AbdullahP.O. Box 10155, Shuaiba 65452
- Rehabilitation and upgrade of steam boilers and control systems, Doha West Power and Water Distillation Station
- Boiler rehabilitation and control system replacement, Az-Zour South Power and Water Distillation Station
- Flowlines and associated works, West Kuwait Area 2
- South Kuwait Excavation, Transportation and Remediation (SKETR)
- Upgrade of gas and condensate network, East Kuwait Area I
- Kuwait Integrated Digital Field (KWIDF) Jurassic Gas Field technical support and service
- Water facilities upgrade
- Safety and SCADA systems for Jurassic wells, North Kuwait
- Two 11 kV, 10 MW substations in Abdulliah and Dharif areas
- Jurassic Production Facility, North Kuwait - civil, structural, mechanical, piping and E&I works
- Nitrogen supply pipeline to KNPC refineries
- Revamp of boilers 1-6, unit 29, Mina Al-Ahmadi Refinery
India
1 office
- Chennai
Saudi Arabia
1 office · 3 projects
- Al Khobar
- C3/C4 refrigeration units and storage tanks, Juaymah NGL Fractionation Plant
- Qurayyah Expansion CCGT IPP
- Debottlenecking production facilities, Abqaiq
Iraq
Projects only
Office directory
| City | Country | Address | Phone |
|---|---|---|---|
| Kuwait (Shuwaikh Port) | Kuwait | P.O. Box 21998, Safat 13080 | +965 2462 4000 |
| Mina Abdullah | Kuwait | P.O. Box 10155, Shuaiba 65452 | +965 2325 3000 |
| Al Khobar | Saudi Arabia | ||
| Chennai | India | ||
| No office matches. | |||
4 offices
All projects
| Project | Country | Sector | Year | Detail |
|---|---|---|---|---|
| Rehabilitation and upgrade of steam boilers and control systems, Doha West Power and Water Distillation Station | Kuwait | Power and water | 2024 | Completion due Q4 2030 |
| Boiler rehabilitation and control system replacement, Az-Zour South Power and Water Distillation Station | Kuwait | Power and water | 2024 | Boilers and control systems for boilers, steam turbines and auxiliaries of 8 units; awarded 2024 |
| Flowlines and associated works, West Kuwait Area 2 | Kuwait | Oil and gas | Ongoing in 2024 per the company annual report | |
| South Kuwait Excavation, Transportation and Remediation (SKETR) | Kuwait | Oil and gas, environmental remediation | Completion due Q1 2027 | |
| C3/C4 refrigeration units and storage tanks, Juaymah NGL Fractionation Plant | Saudi Arabia | Oil and gas | Completion due Q3 2026 | |
| Qurayyah Expansion CCGT IPP | Saudi Arabia | Power | Completion due Q3 2027 | |
| Upgrade of gas and condensate network, East Kuwait Area I | Kuwait | Oil and gas | 2024 | Completion due Q1 2028 |
| Kuwait Integrated Digital Field (KWIDF) Jurassic Gas Field technical support and service | Kuwait | Oil and gas | Completion due Q3 2029 | |
| Debottlenecking production facilities, Abqaiq | Saudi Arabia | Oil and gas | Completion due Q4 2026 | |
| Water facilities upgrade | Kuwait | Oil and gas, water | Completion due Q4 2026 | |
| Safety and SCADA systems for Jurassic wells, North Kuwait | Kuwait | Oil and gas | 2024 | Completion due Q2 2028 |
| Two 11 kV, 10 MW substations in Abdulliah and Dharif areas | Kuwait | Power | Completion due Q4 2026 | |
| Jurassic Production Facility, North Kuwait - civil, structural, mechanical, piping and E&I works | Kuwait | Oil and gas | 2024 | |
| Nitrogen supply pipeline to KNPC refineries | Kuwait | Oil and gas | 2024 | |
| Revamp of boilers 1-6, unit 29, Mina Al-Ahmadi Refinery | Mina Al-Ahmadi, Kuwait | Oil and gas | 2024 | |
| Rehabilitation of steam turbines and generators for 8 units, Sabiya power and water station | Sabiya, Kuwait | Power | 2024 | |
| Repair and life extension of fuel oil tanks and fuel lines, Az-Zour South station | Az-Zour, Kuwait | Power | 2024 | |
| Low-NOx burner replacement for process heaters, Mina Al-Ahmadi Refinery (EPC) | Mina Al-Ahmadi, Kuwait | Oil and gas | 2024 | |
| Sea cooling towers stages 5 and 6 - civil and structural works | Kuwait | Petrochemicals | 2024 | |
| Amine regenerator tower, reboiler and piping replacement, Mina Abdullah Refinery | Mina Abdullah, Kuwait | Oil and gas | 2024 | |
| Flowlines and associated works for KOC (KD 174m contract in backlog) | Kuwait | Oil and gas | In the backlog per the Q2 2026 analyst call; revenue expected from January 2027 | |
| Mechanical maintenance services, Mina Abdullah Refinery | Mina Abdullah, Kuwait | Oil and gas | 2023 | KD 91.7m; 63 months |
| North pier upgrade for crude and product exports, Mina Al-Ahmadi Refinery | Mina Al-Ahmadi, Kuwait | Oil and gas | 2022 | KD 5.8m; 24 months |
| Power lines feeding Al Khairan Power Plant and fuel receiving systems at Az-Zour Power Plant | Kuwait | Power | 2026 | Supply, commissioning and maintenance services |
Sources
- Home - HEISCO, read 22 Nov 2026
- Contact us - HEISCO, read 22 Nov 2026
- Subsidiaries - HEISCO, read 22 Nov 2026
- HEISCO's ongoing projects overview - HEISCO, read 22 Nov 2026
- Governance - HEISCO, read 22 Nov 2026
- Industrial Guide of Kuwait 2022 - Public Authority for Industry, Kuwait, read 21 Nov 2026
- https://www.mew.gov.kw/en/services-menu/contractinfo - Ministry of Electricity, Water and Renewable Energy, Kuwait, read 22 Nov 2026
- https://www.mew.gov.kw/ar/services-menu/contractinfo/ - Ministry of Electricity, Water and Renewable Energy, Kuwait, read 22 Nov 2026
- HEISCO wins KD 5.8 mln contract to upgrade export pier at Kuwait's Ahmadi refinery (30 Mar 2022) - Arab Times (KUNA), read 23 Nov 2026
- Kuwait's Shipbuilding Co., KNPC sign KD-91.7-mln contract (20 Aug 2023) - KUNA, read 23 Nov 2026
- HEISCO wins landmark power plant overhaul contracts (7 Jan 2026) - Times Kuwait, read 23 Nov 2026
- Annual Report 2024 - Heavy Engineering Industries & Shipbuilding Co., read 23 Nov 2026
- Analyst conference transcript, Q2 2026 (13 Aug 2026) - Heavy Engineering Industries & Shipbuilding Co., read 23 Nov 2026