Masdar
Location
Abu Dhabi, UAEOverview
Based in Abu Dhabi, UAE, Masdar is a developer or client. The earliest dated list we hold that names it is from 2023.
Public announcements name it on 3 contract awards, the latest in 2025. Emirates Water and Electricity Company (EWEC) is the client on 2 of them. It is named as the client on 22 contract awards.
Company type
| Role | Developer or client |
Key facts
| Earliest dated listing | 2023 |
| Based in | Abu Dhabi, UAE |
| Contracts named | 3 (latest 2025) |
Contracts and awards
| Contract | Scope | Awarded by | Role | Value | Date | Status | Source |
|---|---|---|---|---|---|---|---|
| Khazna 1.5GW solar PV IPP | Developer - design, finance, build, operate under PPA | Emirates Water and Electricity Company (EWEC) | JV member - ENGIE / Masdar | - | 10 Oct 2025 | Checked | Abu Dhabi Media Office, pv magazine |
| Khazna Solar PV Independent Power Project | 1.5GW (AC) solar PV IPP; PPA/energy purchase agreement signed; consortium is developer, not a construction contract | Emirates Water and Electricity Company (EWEC) | JV member - ENGIE and Masdar (Abu Dhabi Future Energy Company) consortium | - | 10 Oct 2025 | Checked | Abu Dhabi Media Office, SaudiGulf Projects |
| Mohammed bin Rashid Al Maktoum Solar Park Phase 6 (1,800 MW PV IPP) | Build, own, operate 1,800MW solar PV IPP; LCOE 1.6215 US cents/kWh; PPA signed Abu Dhabi; DEWA 60% / Masdar 40% | Dubai Electricity and Water Authority (DEWA) | main contractor | AED 5,509mUSD 1.5bn | 6 Sept 2023 | Checked | Middle East Construction News, Arab News |
Contracts awarded
| Contract | Scope | Contractor | Role | Value | Date | Status | Source |
|---|---|---|---|---|---|---|---|
| Masdar-EWEC RTC solar + BESS | 11.275GWh Haohan BESS supply | BYD | supplier | - | 16 Jul 2026 | Unconfirmed | Power Line, GDN |
| 19GWh round-the-clock renewable project | 11.275GWh battery supply | BYD Energy Storage | supplier | - | 9 Jul 2026 | Unconfirmed | SaudiGulf Projects |
| Round-the-clock 5.2GW solar PV + 19GWh BESS | Supply 11.275GWh Haohan BESS | BYD | supplier | - | Jul 2026 | Unconfirmed | Power Line |
| RTC 1 Plant (North) of the 24/7 solar and BESS project | 7.5GWh PowerTitan 3.0 BESS (1,000 units) and 2.6GW PV inverter solutions | Sungrow | supplier | - | 21 May 2026 | Checked | MEES (paywalled, teaser visible), Energy-Storage.news |
| Round-the-clock 5.2GW solar PV + 19GWh BESS (1GW baseload) | EPC of northern block: 2.1GWdc PV, 7.75GWh BESS, substations | PowerChina | EPC | c. AED 6,978mUSD 1.9bn | 23 Mar 2026 | Checked | Masdar, MEED |
| Round-the-clock solar PV + storage, Mshayrif - North block (2.1GW PV, 7.75GWh) | EPC for northern block of 5.2GW PV + 19GWh BESS project | PowerChina / Huadong Engineering | EPC | c. AED 6,978mUSD 1.9bn | 12 Mar 2026 | Checked | Yicai, MEED |
| 24/7 solar PV and BESS gigascale project, northern block (2.1GW DC PV, 7.75GWh BESS) | Masdar-EWEC round-the-clock solar+storage in Abu Dhabi, up to 1 GW baseload - 5.2 GW DC PV + 19 GWh BESS; PowerChina EPC LoA 17 Jan 2025 (shared with L&T) | POWERCHINA (China Power Construction Corporation, via Abu Dhabi branch and Huadong Engineering) | EPC | c. AED 6,977.8mUSD 1.9bn | 12 Mar 2026 | Checked | Shanghai Stock Exchange news release, MEED (teaser visible, paywalled) |
| 5.2GW solar PV + 19GWh BESS round-the-clock project | 2.6GW TOPCon PV modules | JinkoSolar | supplier | - | 23 Jan 2025 | Checked | TaiyangNews, SaudiGulf Projects |
| Round-the-clock 5.2GW solar PV + 19GWh BESS (1GW baseload) | Masdar-EWEC round-the-clock solar+storage in Abu Dhabi, up to 1 GW baseload - 5.2 GW DC PV + 19 GWh BESS; L&T preferred EPC (north site), LoA 17 Jan 2025 | Larsen & Toubro | EPC | - | 17 Jan 2025 | Checked | Masdar, The Machine Maker |
| 24/7 solar PV and BESS gigascale project (5.2GW DC PV, 19GWh BESS, up to 1GW round-the-clock), Mshayrif, Abu Dhabi | Masdar-EWEC round-the-clock solar+storage in Abu Dhabi, up to 1 GW baseload - 5.2 GW DC PV + 19 GWh BESS; L&T EPC LoA 17 Jan 2025 | Larsen & Toubro | EPC | - | 17 Jan 2025 | Checked | Zawya (Masdar press release), SaudiGulf Projects, Mercom India |
| 24/7 solar PV and BESS gigascale project (5.2GW DC PV) | PV modules (TOPCon), 2.6GW, preferred supplier | JA Solar | supplier | - | 17 Jan 2025 | Checked | Zawya (Masdar press release), SaudiGulf Projects |
| Masdar-EWEC RTC solar + BESS | Masdar-EWEC round-the-clock solar+storage in Abu Dhabi, up to 1 GW baseload - 2.6 GW TOPCon PV modules each (5.2 GW DC total) with 19 GWh BESS | JA Solar / Jinko Solar | supplier | - | 17 Jan 2025 | Checked | Masdar |
| 5.2GW solar PV + 19GWh BESS round-the-clock project | Preferred PV module supplier, 2.6GW TOPCon | JA Solar | supplier | - | 17 Jan 2025 | Checked | Masdar, TaiyangNews, SaudiGulf Projects |
| 24/7 solar PV and BESS gigascale project (19GWh BESS, TENER) | Battery energy storage, 19GWh, TENER technology, preferred supplier | CATL | supplier | - | 17 Jan 2025 | Checked | Zawya (Masdar press release), SaudiGulf Projects |
| 24/7 solar PV and BESS gigascale project (5.2GW DC PV) | PV modules (TOPCon), 2.6GW, preferred supplier | Jinko Solar | supplier | - | 17 Jan 2025 | Checked | Zawya (Masdar press release), SaudiGulf Projects |
| 5.2GW solar PV + 19GWh BESS round-the-clock project | Masdar-EWEC round-the-clock solar+storage in Abu Dhabi, up to 1 GW baseload - CATL TENER BESS supply, 19 GWh, alongside 5.2 GW DC PV | CATL | supplier | - | 17 Jan 2025 | Checked | Masdar, TaiyangNews, SaudiGulf Projects |
| Masdar-EWEC round-the-clock 5.2GW solar PV + 19GWh BESS - north site | Masdar-EWEC round-the-clock solar+storage in Abu Dhabi, up to 1 GW baseload - 5.2 GW DC PV + 19 GWh BESS; L&T preferred EPC (north site), LoA 17 Jan 2025 | Larsen & Toubro | EPC | - | 17 Jan 2025 | Checked | Masdar, Larsen & Toubro, Angel One, MEED (teaser), TaiyangNews, MEED (free teaser) |
| Masdar-EWEC round-the-clock 5.2GW solar PV + 19GWh BESS - south site | Masdar-EWEC round-the-clock solar+storage in Abu Dhabi, up to 1 GW baseload - 5.2 GW DC PV + 19 GWh BESS; PowerChina preferred EPC, LoA 17 Jan 2025 | PowerChina | EPC | - | 17 Jan 2025 | Checked | Masdar, MEED (teaser), TaiyangNews, SaudiGulf Projects |
| Masdar-EWEC RTC solar + BESS | 19GWh TENER BESS supply (per Jan 2025 announcement) | CATL | supplier | - | 17 Jan 2025 | Checked | Masdar |
| Round-the-clock 5.2GW solar PV + 19GWh BESS | Preferred PV module supplier, 2.6GW TOPCon | Jinko Solar | supplier | - | 17 Jan 2025 | Checked | Masdar |
| 19GWh RTC solar + BESS project | Masdar-EWEC round-the-clock solar+storage in Abu Dhabi, up to 1 GW baseload - 5.2 GW DC PV + 19 GWh BESS; EPC letters of award 17 Jan 2025 | Larsen & Toubro / PowerChina consortium | EPC | c. AED 22,035mUSD 6bn | 2025 | Unconfirmed | MEED |
| Mohammed bin Rashid Al Maktoum Solar Park Phase 6 (1,800 MW PV IPP) | Turnkey EPC of 1,800MWac solar PV plant, evacuation/interconnection, two GIS substations, HV underground cabling, MV distribution | Larsen & Toubro (L&T Construction, Renewable EPC arm of PT&D) | EPC | - | 30 Jan 2024 | Checked | Larsen & Toubro, Zawya |
From public announcements, stock exchange filings and press; values as announced.