Based in Abu Dhabi, UAE, Masdar is a developer or client. The earliest dated list we hold that names it is from 2023.

Public announcements name it on 3 contract awards, the latest in 2025. Emirates Water and Electricity Company (EWEC) is the client on 2 of them. It is named as the client on 22 contract awards.

Company type

RoleDeveloper or client

Key facts

Earliest dated listing2023
Based inAbu Dhabi, UAE
Contracts named3 (latest 2025)

Contracts and awards

Contracts and awards
ContractScopeAwarded byRoleValueDateStatusSource
Khazna 1.5GW solar PV IPPDeveloper - design, finance, build, operate under PPAEmirates Water and Electricity Company (EWEC)JV member - ENGIE / Masdar-10 Oct 2025CheckedAbu Dhabi Media Office, pv magazine
Khazna Solar PV Independent Power Project1.5GW (AC) solar PV IPP; PPA/energy purchase agreement signed; consortium is developer, not a construction contractEmirates Water and Electricity Company (EWEC)JV member - ENGIE and Masdar (Abu Dhabi Future Energy Company) consortium-10 Oct 2025CheckedAbu Dhabi Media Office, SaudiGulf Projects
Mohammed bin Rashid Al Maktoum Solar Park Phase 6 (1,800 MW PV IPP)Build, own, operate 1,800MW solar PV IPP; LCOE 1.6215 US cents/kWh; PPA signed Abu Dhabi; DEWA 60% / Masdar 40%Dubai Electricity and Water Authority (DEWA)main contractorAED 5,509mUSD 1.5bn6 Sept 2023CheckedMiddle East Construction News, Arab News

Contracts awarded

Contracts awarded
ContractScopeContractorRoleValueDateStatusSource
Masdar-EWEC RTC solar + BESS11.275GWh Haohan BESS supplyBYDsupplier-16 Jul 2026UnconfirmedPower Line, GDN
19GWh round-the-clock renewable project11.275GWh battery supplyBYD Energy Storagesupplier-9 Jul 2026UnconfirmedSaudiGulf Projects
Round-the-clock 5.2GW solar PV + 19GWh BESSSupply 11.275GWh Haohan BESSBYDsupplier-Jul 2026UnconfirmedPower Line
RTC 1 Plant (North) of the 24/7 solar and BESS project7.5GWh PowerTitan 3.0 BESS (1,000 units) and 2.6GW PV inverter solutionsSungrowsupplier-21 May 2026CheckedMEES (paywalled, teaser visible), Energy-Storage.news
Round-the-clock 5.2GW solar PV + 19GWh BESS (1GW baseload)EPC of northern block: 2.1GWdc PV, 7.75GWh BESS, substationsPowerChinaEPCc. AED 6,978mUSD 1.9bn23 Mar 2026CheckedMasdar, MEED
Round-the-clock solar PV + storage, Mshayrif - North block (2.1GW PV, 7.75GWh)EPC for northern block of 5.2GW PV + 19GWh BESS projectPowerChina / Huadong EngineeringEPCc. AED 6,978mUSD 1.9bn12 Mar 2026CheckedYicai, MEED
24/7 solar PV and BESS gigascale project, northern block (2.1GW DC PV, 7.75GWh BESS)Masdar-EWEC round-the-clock solar+storage in Abu Dhabi, up to 1 GW baseload - 5.2 GW DC PV + 19 GWh BESS; PowerChina EPC LoA 17 Jan 2025 (shared with L&T)POWERCHINA (China Power Construction Corporation, via Abu Dhabi branch and Huadong Engineering)EPCc. AED 6,977.8mUSD 1.9bn12 Mar 2026CheckedShanghai Stock Exchange news release, MEED (teaser visible, paywalled)
5.2GW solar PV + 19GWh BESS round-the-clock project2.6GW TOPCon PV modulesJinkoSolarsupplier-23 Jan 2025CheckedTaiyangNews, SaudiGulf Projects
Round-the-clock 5.2GW solar PV + 19GWh BESS (1GW baseload)Masdar-EWEC round-the-clock solar+storage in Abu Dhabi, up to 1 GW baseload - 5.2 GW DC PV + 19 GWh BESS; L&T preferred EPC (north site), LoA 17 Jan 2025Larsen & ToubroEPC-17 Jan 2025CheckedMasdar, The Machine Maker
24/7 solar PV and BESS gigascale project (5.2GW DC PV, 19GWh BESS, up to 1GW round-the-clock), Mshayrif, Abu DhabiMasdar-EWEC round-the-clock solar+storage in Abu Dhabi, up to 1 GW baseload - 5.2 GW DC PV + 19 GWh BESS; L&T EPC LoA 17 Jan 2025Larsen & ToubroEPC-17 Jan 2025CheckedZawya (Masdar press release), SaudiGulf Projects, Mercom India
24/7 solar PV and BESS gigascale project (5.2GW DC PV)PV modules (TOPCon), 2.6GW, preferred supplierJA Solarsupplier-17 Jan 2025CheckedZawya (Masdar press release), SaudiGulf Projects
Masdar-EWEC RTC solar + BESSMasdar-EWEC round-the-clock solar+storage in Abu Dhabi, up to 1 GW baseload - 2.6 GW TOPCon PV modules each (5.2 GW DC total) with 19 GWh BESSJA Solar / Jinko Solarsupplier-17 Jan 2025CheckedMasdar
5.2GW solar PV + 19GWh BESS round-the-clock projectPreferred PV module supplier, 2.6GW TOPConJA Solarsupplier-17 Jan 2025CheckedMasdar, TaiyangNews, SaudiGulf Projects
24/7 solar PV and BESS gigascale project (19GWh BESS, TENER)Battery energy storage, 19GWh, TENER technology, preferred supplierCATLsupplier-17 Jan 2025CheckedZawya (Masdar press release), SaudiGulf Projects
24/7 solar PV and BESS gigascale project (5.2GW DC PV)PV modules (TOPCon), 2.6GW, preferred supplierJinko Solarsupplier-17 Jan 2025CheckedZawya (Masdar press release), SaudiGulf Projects
5.2GW solar PV + 19GWh BESS round-the-clock projectMasdar-EWEC round-the-clock solar+storage in Abu Dhabi, up to 1 GW baseload - CATL TENER BESS supply, 19 GWh, alongside 5.2 GW DC PVCATLsupplier-17 Jan 2025CheckedMasdar, TaiyangNews, SaudiGulf Projects
Masdar-EWEC round-the-clock 5.2GW solar PV + 19GWh BESS - north siteMasdar-EWEC round-the-clock solar+storage in Abu Dhabi, up to 1 GW baseload - 5.2 GW DC PV + 19 GWh BESS; L&T preferred EPC (north site), LoA 17 Jan 2025Larsen & ToubroEPC-17 Jan 2025CheckedMasdar, Larsen & Toubro, Angel One, MEED (teaser), TaiyangNews, MEED (free teaser)
Masdar-EWEC round-the-clock 5.2GW solar PV + 19GWh BESS - south siteMasdar-EWEC round-the-clock solar+storage in Abu Dhabi, up to 1 GW baseload - 5.2 GW DC PV + 19 GWh BESS; PowerChina preferred EPC, LoA 17 Jan 2025PowerChinaEPC-17 Jan 2025CheckedMasdar, MEED (teaser), TaiyangNews, SaudiGulf Projects
Masdar-EWEC RTC solar + BESS19GWh TENER BESS supply (per Jan 2025 announcement)CATLsupplier-17 Jan 2025CheckedMasdar
Round-the-clock 5.2GW solar PV + 19GWh BESSPreferred PV module supplier, 2.6GW TOPConJinko Solarsupplier-17 Jan 2025CheckedMasdar
19GWh RTC solar + BESS projectMasdar-EWEC round-the-clock solar+storage in Abu Dhabi, up to 1 GW baseload - 5.2 GW DC PV + 19 GWh BESS; EPC letters of award 17 Jan 2025Larsen & Toubro / PowerChina consortiumEPCc. AED 22,035mUSD 6bn2025UnconfirmedMEED
Mohammed bin Rashid Al Maktoum Solar Park Phase 6 (1,800 MW PV IPP)Turnkey EPC of 1,800MWac solar PV plant, evacuation/interconnection, two GIS substations, HV underground cabling, MV distributionLarsen & Toubro (L&T Construction, Renewable EPC arm of PT&D)EPC-30 Jan 2024CheckedLarsen & Toubro, Zawya

From public announcements, stock exchange filings and press; values as announced.