Haliba Field Development - general civil and building works
Haliba Field, United Arab Emirates
- Client
- Larsen & Toubro Hydrocarbon Engineering (main contractor) for Al Dhafra Petroleum
- Role
- Civil subcontractor
Trades as OQC
Obaid Al Qubaisi Transporting & General Contracting Establishment, known as OQC, is an Abu Dhabi contractor that grew up around the Habshan oil and gas field. It started there in 2001 with eight trucks, two caravans and 15 staff, and now reports more than 1,500 employees, four labour camps and its own fleet of cranes, excavators, dozers, suction excavators, heavy trucks and buses.
The business has four lines: engineering and construction (civil works, earthworks, foundations, steel erection, paving, industrial buildings, temporary site facilities), plant hire and transport including heavy lifts up to 200 tons and waste haulage, workforce accommodation camps, and a ready-mix concrete batching plant in Habshan. It describes itself as an ADNOC-approved contractor and mostly works as a civil subcontractor to the EPC contractors on ADNOC onshore projects.
Its head office moved to Addax Tower on Reem Island in 2018, while operations are run from its own facility on the Buhasa road at Habshan. The website's news section has had no company news since 2016 and the certificates it quotes are older ISO editions, so some details may be out of date.
| Role | Civil contractor |
| Legal form | Establishment |
| Sectors | Oil and gas (onshore), industrial, infrastructure |
| Services | Civil works, earthworks, site preparation, foundations, soil improvement, steel structure erection, concrete and asphalt paving, industrial buildings, temporary site facilities, precast elements, painting and waterproofing, heavy lifting, plant and equipment hire, land transport, water and diesel supply, waste management, garage services, labour camp accommodation, ready-mix concrete |
| Founded | 2001, at the Habshan oil field |
| Team | 1,500+ employees, as the firm states |
| Labour camps | 4 |
| Offices | Head office on Reem Island, Abu Dhabi; operations office at Habshan |
| Safety record | 28 million safe man-hours since 2012, as the firm states; 25 million without a lost-time injury reached in 2019 |
| Certifications | ISO 9001:2008, ISO 14001:2004, OHSAS 18001:2007, as the site states |
| Client approval | Describes itself as an ADNOC-approved contractor; accommodation service approved by ADCO |
| Lifting capacity | Heavy lifting up to 200 tons |
| Ready-mix | Fully automated concrete batching plant in Habshan (OQC Readymix) |
| Clients named | Engineering and construction clients listed: ADNOC, Al Hosn, Punj Lloyd, CCC, SK Engineering & Construction, Essar Construction, Inabensa, Robt Stone, Alsa Engineering, Petrojet, Prezioso Emdad and Pureworld |
| Supply references | Plant, transport and camp accommodation supplied to about 20 named contractors, among them McConnell Dowell, Samsung Engineering, Siemens, Tecnicas Reunidas, Kharafi National, Galfar and Amana Contracting |
Haliba Field, United Arab Emirates
Al Dabb'iya, United Arab Emirates
Habshan, United Arab Emirates
United Arab Emirates
United Arab Emirates · 2016
United Arab Emirates · 2007
Ministry of Industry and Advanced Technology (MoIAT)
National ICV certified suppliers
| Listed as | Obaid Al Qubaisi Transporting & General Contracting Establishment |
See the list · Checked 17 Nov 2026
Abu Dhabi Department of Municipalities and Transport
Engineering Firms with Valid Classification
| Licence no. | CN-1042785 |
| Listed as | OBAID AL QUBAISI TRANSPORTING & GENERAL CONTRACTING ESTABLISHMENT |
See the list · Checked 23 Nov 2026
History and offices of Obaid Al Qubaisi Transporting & General Contracting Establishment.
Company set up at the Habshan oil field with 8 trucks, 2 caravans and 15 employees
Built temporary site facilities for Punj Lloyd on GASCO's OGD-III Offsites and Utilities package
Reached 10 million safe man-hours without a lost-time injury
Selected again by GASCO for miscellaneous civil works on its pipeline network, starting 1 April 2016
GASCO miscellaneous civil works - pipeline network, United Arab Emirates - Civil contractor
Reached 19 million safe man-hours without a lost-time injury; Habshan office moved to a new building
Head office moved to Addax Tower, Reem Island, Abu Dhabi
Completed 25 million safe man-hours without a lost-time injury
| City | Country | Address | Phone |
|---|---|---|---|
| Abu Dhabi | United Arab Emirates | Addax Tower, 40th Floor, Office 4008, Reem Island | +971 2 643 0953 |
| Habshan | United Arab Emirates | OQC Facility, Buhasa Road, Madinat Zayed, Habshan, P.O. Box 50433 | +971 2 884 2111 |
| No office matches. | |||
2 offices