Pyramids Energy logo

Pyramids Energy

Overview

Pyramids Energy is an Abu Dhabi electrical contractor with its office in the Union National Bank building on Airport Road. It works on medium and high voltage power infrastructure for utilities, oil and gas companies and main contractors: supplying, installing, testing and commissioning distribution and power transformers, ring main units, switchgear, substations and MV and LV cables, joints and terminations, and maintaining private cable networks.

Its published project record, running from 2006 to 2014, includes transformer and switchgear work for ADNOC, GASCO, ADMA-OPCO, ZADCO and Takreer at Ruwais, a 33/11 kV substation under a FEWA contract, LV cabling on the Dubai International Airport phase II expansion and cable works for Emirates Steel. The firm holds Abu Dhabi classification for building electrical works and is an ADDC approved contractor for LV distribution cables.

Company type

RoleSubcontractor
SectorsPower and utilities, oil and gas, industrial, infrastructure
ServicesMV/HV cable jointing and terminations, transformer and substation installation, LV switchgear supply and modification, testing and commissioning, cable network maintenance

Projects

Scroll the table sideways to see every column.

ProjectLocationYearClientRoleSectorStatus
Takreer Ruwais Refinery transformer works and 132/33 kV transformer at SS1400 gasoline plantRuwais, United Arab Emirates2013IMECO (for Takreer)Supply, installation, testing and commissioningOil and gasCompleted
FEWA contract E10/2011 - 33/11 kV substationNorthern Emirates, United Arab Emirates2014ETASupply, installation and commissioningPowerCompleted
Emirates Steel MSS to RO plant phase I cablingAbu Dhabi, United Arab Emirates2014Emirates Steel11 kV cable removal and installationIndustrialCompleted
Danat Al Emarat hospital 11 kV cablesAbu Dhabi, United Arab Emirates2014Drake & ScullSupply, installation and testing of 11 kV cables and terminationsHealthcareCompleted
Dubai International Airport expansion phase II, AX-134 (C3) packageDubai, United Arab Emirates2011ETALV cable laying and terminationsAviationCompleted
Cleveland Clinic Abu Dhabi DC systemAbu Dhabi, United Arab Emirates2011ETASupply, installation, test and commissioningHealthcareCompleted
Masdar and Siemens HQ infrastructure 22 kV joints and terminationsAbu Dhabi, United Arab Emirates2013IMECOSupply and installationPowerCompleted
Zayed Port private cable maintenance and transformer testingAbu Dhabi, United Arab Emirates2013AgthiaLV cable replacement, breaker repair, transformer testingPortsCompleted
Taweelah 11 kV substation transformerTaweelah, United Arab Emirates2007GASCOSupply, installation, testing and commissioningOil and gasCompleted
MCC retrofittingUnited Arab Emirates2007ADMA-OPCOSupply, installation, testing and commissioningOil and gasCompleted
Transformer replacement 1,600 kVA 22/0.4 kVUnited Arab Emirates2007ZADCOSupply, installation, test and commissioningOil and gasCompleted
LV switchgear modification and ACB replacementUnited Arab Emirates2006ADNOCSupply, installation, testing and commissioningOil and gasCompleted

Official registrations and listings

  • Abu Dhabi Distribution Company (ADDC, TAQA Distribution)

    ADDC approved contractors - LV distribution cables (work group 2140100)

    Listed asPYRAMIDS ENERGY

    See the list · Checked 17 Nov 2026

  • Abu Dhabi Department of Municipalities and Transport

    Engineering Firms with Valid Classification

    Licence no.CN-1204933
    Listed asPYRAMIDS ENERGY

    See the list · Checked 23 Nov 2026

Company detail

History of Pyramids Energy.

History

  1. project

    LV switchgear modification and ACB replacement, United Arab Emirates - Supply, installation, testing and commissioning

  2. project

    Taweelah 11 kV substation transformer, Taweelah, United Arab Emirates - Supply, installation, testing and commissioning

  3. project

    MCC retrofitting, United Arab Emirates - Supply, installation, testing and commissioning

  4. project

    Transformer replacement 1,600 kVA 22/0.4 kV, United Arab Emirates - Supply, installation, test and commissioning

  5. project

    Dubai International Airport expansion phase II, AX-134 (C3) package, Dubai, United Arab Emirates - LV cable laying and terminations

  6. project

    Cleveland Clinic Abu Dhabi DC system, Abu Dhabi, United Arab Emirates - Supply, installation, test and commissioning

  7. project

    Takreer Ruwais Refinery transformer works and 132/33 kV transformer at SS1400 gasoline plant, Ruwais, United Arab Emirates - Supply, installation, testing and commissioning

  8. project

    Masdar and Siemens HQ infrastructure 22 kV joints and terminations, Abu Dhabi, United Arab Emirates - Supply and installation

  9. project

    Zayed Port private cable maintenance and transformer testing, Abu Dhabi, United Arab Emirates - LV cable replacement, breaker repair, transformer testing

  10. project

    FEWA contract E10/2011 - 33/11 kV substation, Northern Emirates, United Arab Emirates - Supply, installation and commissioning

  11. project

    Emirates Steel MSS to RO plant phase I cabling, Abu Dhabi, United Arab Emirates - 11 kV cable removal and installation

  12. project

    Danat Al Emarat hospital 11 kV cables, Abu Dhabi, United Arab Emirates - Supply, installation and testing of 11 kV cables and terminations

Sources

  1. Pyramids Energy - Pyramids Energy, read 22 Nov 2026
  2. Engineering Firms with Valid Classification - Abu Dhabi Department of Municipalities and Transport, read 16 Nov 2026
  3. ADDC approved contractor list - power - Abu Dhabi Distribution Company (TAQA Distribution), read 17 Nov 2026

Similar companies

More electrical contractors in Abu Dhabi

More electrical companies in Abu Dhabi