Roads and Transport Authority (RTA)
Location
Dubai, UAEOverview
Based in Dubai, UAE, Roads and Transport Authority (RTA) is a developer or client.
It is named as the client on 19 contract awards.
Company type
| Role | Developer or client |
Key facts
| Based in | Dubai, UAE |
Contracts awarded
| Contract | Scope | Contractor | Role | Value | Date | Status | Source |
|---|---|---|---|---|---|---|---|
| Latifa bint Hamdan Corridor Development - two packages (Al Khail link; Al Meydan Street interchange) | New road to Al Khail Road with bridges and tunnels; Al Meydan Street sections and interchange; cycle track; completion end-2028 | Larsen & Toubro (Transportation Infrastructure) | main contractor | - | 30 Sept 2026 | Unconfirmed | Dubai Media Office, The Machine Maker, SaudiGulf Projects |
| Dubai Metro Route 2020 extension to Al Maktoum International Airport - design | Design consultancy for ~3 km extension with two stations, Expo 2020 metro station to DWC West Terminal | AECOM | consultant | - | 11 Sept 2026 | Unconfirmed | MEED (teaser) |
| Route 2020 extension - Expo to Al Maktoum airport West Terminal | Design (~3km, two stations) | AECOM | consultant | - | 11 Sept 2026 | Unconfirmed | MEED (free teaser) |
| Dubai Loop phase 1 (6.4km, 4 stations, DIFC-Dubai Mall) - design review and construction supervision | Design review and construction supervision for the first phase of the Dubai Loop underground transport system | Aecom | consultant | - | 11 May 2026 | Unconfirmed | MEED |
| Road infrastructure contract - ~11 km bridges and tunnels | Bridges and tunnels, ~11 km combined | Not named | main contractor | - | 27 Apr 2026 | Unconfirmed | MEED |
| Dubai Walk Phase I - Historic Al Ras Walkway | 12 km walkways, 5 km cycle tracks, 10 art spaces | Not named | main contractor | - | 22 Mar 2026 | Unconfirmed | Dubai Media Office |
| Latifa Bint Hamdan Street phase 1 (12.2km road, 8.1km bridges) | road widening and bridges | Larsen & Toubro | main contractor | - | Feb 2026 | Checked | MEED, SaudiGulf Projects |
| Sheikh Zayed bin Hamdan St / Al Awir Rd / Al Manama St intersection | 2.3km bridges, lane expansion | DBB Contracting | main contractor | - | 16 Dec 2025 | Unconfirmed | Government of Dubai Media Office, MEED (free teaser) |
| Sheikh Zayed bin Hamdan Al Nahyan Street - Al Awir / Al Manama roads interchange | Grade-separated interchange, 2,300 m main bridges, widening to 4 lanes each way; completion Q3 2028 | Not named | main contractor | - | 14 Dec 2025 | Unconfirmed | RTA |
| Sheikh Zayed bin Hamdan Al Nahyan Street intersection with Al Awir Road and Al Manama Street | road intersection | DBB Contracting | main contractor | - | Dec 2025 | Unconfirmed | MEED |
| Dubai Metro Gold Line - design and supervision consultancy | Consultancy: concept and preliminary design, tender documents, construction supervision, defects period | AECOM | consultant | AED 628m | 6 Oct 2025 | Unconfirmed | MEED (teaser), Metro Rail Today |
| Al Mustaqbal Street Development Project | ~1.7 km tunnels and bridges, widen ~3.5 km to 4 lanes each way, 5 bridges to Sheikh Zayed Road | Not named | main contractor | AED 633m | 13 Jul 2025 | Unconfirmed | Dubai Media Office, MEED |
| Dubai Metro Blue Line | Dubai Metro Blue Line, opening 2029 - 5-year PMC for 30 km, 14-station line; design review to handover; 320,000 passengers/day | Parsons | PMC | AED 801mUSD 218m | 8 Jul 2025 | Checked | Parsons, SaudiGulf Projects, TipRanks / The Fly, ENR |
| Al Qudra Street Development Project | Widen 11.6 km of road, ~2.7 km of bridges, interchanges, Al Qudra St / Sheikh Zayed bin Hamdan Al Nahyan St / Emirates Road | Wade Adams | main contractor | AED 798m | 23 Feb 2025 | Unconfirmed | Dubai Media Office, MEED |
| Al Fay Street Development Project | 5 intersections, 13.5 km bridges, 12.9 km roads, Sheikh Mohamed bin Zayed Rd to Emirates Rd; capacity 64,400 veh/h | Not named | main contractor | AED 1,500m | 19 Jan 2025 | Unconfirmed | RTA, Construction Review |
| Dubai Metro Blue Line | Design and build; 30 km, 14 stations (15.5 km underground, 14.5 km elevated), 3 interchanges, ~1,300 m Creek bridge; MAPA and LIMAK civil, CRRC systems and rolling stock; opening Sep 2029 | MAPA / LIMAK / CRRC JV | main contractor | AED 20,500m | 19 Dec 2024 | Checked | Dubai Media Office, Railway Gazette, The National, Arabian Business, SteelRadar |
| Upgrade of 16 bus stations and 6 bus depots (3-year plan) | Bus stations (Deira, Bur Dubai, Hatta etc) and depots (Al Khawaneej, Al Qusais, Al Ruwayyah, Al Aweer, Jebel Ali, Al Quoz) | Not named | main contractor | - | 31 Mar 2024 | Unconfirmed | Dubai Media Office |
| Al Khail Road improvement (7 locations) | Road improvements | Wade Adams | main contractor | AED 700m | 27 Feb 2024 | Unconfirmed | MEED (free teaser) |
| Umm Suqeim Street improvement | Street improvement | Not named | main contractor | AED 332m | 7 Jan 2024 | Unconfirmed | Emirates 24/7 |
From public announcements, stock exchange filings and press; values as announced.