Rowad Modern Engineering
Overview
Rowad Modern Engineering is a Cairo turnkey contractor founded in 1998. It builds power plants, heavy industrial facilities, ports, railways, bridges and roads, water and wastewater works, and commercial, hospital, hotel and education buildings, and has a heritage restoration line for historic palaces and mosques. It reports close to 4,000 employees and more than 15,000 site labourers, with ISO 9001, 14001 and 45001 systems.
Much of its record comes from civil packages for international EPC contractors and developers. It did the civil works for the power blocks of the 4,800 MW Beni Suef combined cycle plant for the Siemens-Elsewedy consortium, built four plots of the Benban solar park and wind farm foundations for Siemens Gamesa, and works with DP World at Sokhna and Algiers. In 2026 it signed, with Alstom Ferroviaria, two World Bank-financed contracts for signalling upgrade and track installation on the Cairo-Alexandria line.
Outside Egypt it has worked in Algeria since 2006 and later in Chad, Mozambique, Nigeria, Libya, Cote d'Ivoire and the Comoros, opened a Saudi branch in 2022 and branches in Iraq and Abu Dhabi in 2024. Its subsidiaries are Driller (deep foundations), Tetra (design-and-build and post-tensioning), Troy (insulation and protective finishes) and RME Fit-Out.
Company type
| Role | Main contractor |
| Sectors | Power, industrial, ports, rail, roads and bridges, water and wastewater, commercial and public buildings, heritage restoration |
| Services | Turnkey construction, civil works packages, design and build, MEP, piling and foundations (via Driller), fit-out (via RME Fit-Out) |
Key facts
| Founded | 1998, Egypt |
| Staff | Close to 4,000 employees and 15,000+ labourers (company figures) |
| Certifications | ISO 9001, ISO 14001, ISO 45001 |
| Branches | Algeria (2006), Libya (2020), Cote d'Ivoire (2021), Saudi Arabia (2022), Iraq (2024), UAE - Abu Dhabi (2024), Greece (2025) |
| Other operations | Chad (from 2011), Mozambique (2012), Nigeria (2014), Comoros (2021) |
| Subsidiaries | Driller (deep foundations, est. 2015), Tetra (design and build, post-tensioning), Troy (insulation and protective finishes, stake bought early 2019), RME Fit-Out |
Projects
Scroll the table sideways to see every column.
| Project | Location | Client | Role | Scale | Sector | Status |
|---|---|---|---|---|---|---|
| Beni Suef 4,800 MW combined cycle power plant | Beni Suef, Egypt | Ministry of Electricity | Civil works for the power blocks, for the Siemens-Elsewedy consortium | 4,800 MW | Power | Completed |
| Benban photovoltaic solar park - four plots | Egypt | TSK-Enviromena JV | Construction contractor | About 200 MW | Power - solar | Completed |
| Cairo-Alexandria Trade Logistics Development Project - signalling upgrade and track installation, Lots 1 and 3 | Egypt | Government of Egypt (World Bank-financed, project P177932) | Contractor in joint venture with Alstom Ferroviaria | Lot 1 USD 189.2m, Lot 3 USD 171.4m (Rowad share USD 94.6m and USD 85.7m) | Rail | Ongoing |
| Olympic Multi-Sports Hall | Egypt | Egyptian Armed Forces | Turnkey contractor | 40,000 m2 BUA, 15,000 spectators | Sports | |
| Rabigh CCPP 1,200 MW extension | Rabigh, Saudi Arabia | Elsewedy PSP | Turnkey bored piling and civil works | 1,200 MW | Power | Ongoing |
| Al Haer sewage treatment plant | Saudi Arabia | VA Tech Wabag KSA | Civil works | 200,000 m3/day | Wastewater | Ongoing |
| High-speed rail depots | Egypt | National Authority for Tunnels | Design and build, 50-50 JV with Orascom Construction | 33 assets along a 620 km network | Rail | Ongoing |
| Sohag high-speed rail station | Sohag, Egypt | National Authority for Tunnels | Turnkey civil, architectural, MEP, landscape and road works | Three 420 m platforms | Rail | Ongoing |
| DP World Sokhna container terminal - Basin 2 | Ain Sokhna, Egypt | DP World Ain Sokhna | Onshore port and terminal works | Ports | ||
| Port of Algiers container terminal refurbishment | Algiers, Algeria | DP World Djazair | Upgrading and rehabilitation contractor | Ports | ||
| Third Ring Road, Tripoli | Tripoli, Libya | Libyan Ministry of Housing and Utilities | Contractor | 24 km, 35 structures, 700+ piles | Roads and bridges | Completed |
| Mohamed Ali Palace (Fountain Palace) restoration | Cairo, Egypt | Ministry of Tourism and Antiquities | Restoration and rehabilitation contractor | Heritage restoration | Completed |
Official registrations and listings
World Bank contract awards (source: World Bank, CC BY 4.0; multilateral development bank, not a government register)
Contract awards - works and construction goods
See the list · Checked 23 Nov 2026
Contracts on public award lists
Named in World Bank contract awards
| Contract | Year |
|---|---|
| LOT 1:Single responsibility contract of design, supplying, construction, phasing,testing and… (USD 94.6m; Apr 2026; World Bank-financed, Egypt) | 2026 |
| LOT 3:Single responsibility contract of design, supplying, construction, phasing,testing and… (USD 85.7m; Apr 2026; World Bank-financed, Egypt) | 2026 |
Titles as the award lists print them.
Company detail
History, locations, offices and documents of Rowad Modern Engineering.
History
- milestone
Rowad Modern Engineering established in Egypt
- expansion
Algeria branch opened
- expansion
Operations start in Chad
- expansion
Operations start in Mozambique
- expansion
Operations start in Nigeria
- expansion
Deep foundations subsidiary Driller set up
- deal
Significant stake bought in Troy, a Greek-Egyptian insulation and protective finishes firm founded in 2018
- expansion
Libya branch opened
- expansion
Cote d'Ivoire branch opened and operations start in the Comoros
- expansion
Saudi Arabia branch opened
- expansion
Branches opened in Iraq and Abu Dhabi, UAE
- expansion
Greece branch opened
- project
Signs two World Bank-financed signalling and track contracts on the Cairo-Alexandria line with Alstom Ferroviaria
Where the company operates
United Arab Emirates
1 office
- Abu Dhabi
Egypt
Projects only · 8 projects
- Beni Suef 4,800 MW combined cycle power plant
- Benban photovoltaic solar park - four plots
- Cairo-Alexandria Trade Logistics Development Project - signalling upgrade and track installation, Lots 1 and 3
- Olympic Multi-Sports Hall
- High-speed rail depots
- Sohag high-speed rail station
- DP World Sokhna container terminal - Basin 2
- Mohamed Ali Palace (Fountain Palace) restoration
Algeria
Projects only · 1 project
- Port of Algiers container terminal refurbishment
Chad
Projects only
Comoros
Projects only
Libya
Projects only · 1 project
- Third Ring Road, Tripoli
Mozambique
Projects only
Nigeria
Projects only
Saudi Arabia
Projects only · 2 projects
- Rabigh CCPP 1,200 MW extension
- Al Haer sewage treatment plant
Sudan
Projects only
Office directory
| City | Country | ||
|---|---|---|---|
| Abu Dhabi | United Arab Emirates | ||
| No office matches. | |||
1 offices
Documents and reports
| Document | Publisher | Date | Format |
|---|---|---|---|
| Rowad Modern Engineering company profile | Rowad Modern Engineering | 2025-11-05 |
Sources
- Rowad Modern Engineering | Building Realities - Rowad Modern Engineering, read 23 Nov 2026
- About us - Rowad Modern Engineering, read 23 Nov 2026
- Rowad company profile (5 Nov 2025) - Rowad Modern Engineering, read 23 Nov 2026
- Our subsidiaries - Rowad Modern Engineering, read 23 Nov 2026
- World Bank contract awards (multilateral development bank, not a government register) - Major contract awards - World Bank contract awards, read 23 Nov 2026