Soma Enterprise Limited
Overview
Soma Enterprise is an Indian infrastructure contractor and developer based in Hyderabad, with more than two decades of work on large civil engineering projects across most Indian states. It takes on work both as an EPC contractor and as a developer under public-private partnership and build-operate-transfer models, often in partnership with large domestic and international builders. The company says it is pursuing work in the Middle East, Africa, South East Asia and Eastern Europe, and it is registered with Oman's Tender Board at the excellent grade.
Its portfolio spans highways and flyovers, metro tunnels, dams, barrages, canals and water supply tunnels, and hydroelectric schemes. Projects it highlights include the 291 km six-laning of the Panipat to Jalandhar section of NH1 on a DBFO basis, the Kanakadurgamma flyover in Vijayawada, twin-bore metro tunnels and underground stations in Delhi and Mumbai, the 102 m Middle Vaitarna roller-compacted concrete dam and a 6.7 km TBM water tunnel for Mumbai, and the dam of the 2,000 MW Subansiri Lower hydroelectric project. It holds ISO 9001, ISO 14001 and ISO 45001 certification.
Company type
| Role | Contractor |
| Legal form | Public limited company (India) |
| Sectors | Transportation, water resources, energy, urban infrastructure |
| Services | EPC contracting, PPP and BOT infrastructure development, tunnelling, dams and barrages, highways and flyovers |
Key facts
| Experience | 20+ years in Indian infrastructure (firm figure) |
| Certifications | ISO 9001, ISO 14001, ISO 45001 |
| Target markets | India; exploring the Middle East, Africa, South East Asia, Eastern Europe |
Projects
Scroll the table sideways to see every column.
| Project | Location | Client | Role | Scale | Sector |
|---|---|---|---|---|---|
| Panipat to Jalandhar NH1 six-laning | India | Developer and contractor (DBFO, BOT) | 291.1 km; 10 major bridges, 72 flyovers, 5 viaducts | Highways | |
| Kanakadurgamma flyover, NH9 | Vijayawada, India | EPC contractor | 5.122 km 4-lane road incl. 2.55 km 6-lane elevated flyover | Highways | |
| Subansiri Lower hydroelectric project dam | India | Contractor | 2,000 MW scheme; concrete gravity dam 127 m high, 283 m long | Hydropower | |
| Middle Vaitarna dam (MVP-1) | Mumbai, India | MCGM | Contractor | RCC dam 102.4 m high, 573 m long | Water supply |
| Mumbai water supply tunnel (MVP-16), Gundavli to Kapurbawdi | Mumbai, India | MCGM | Contractor | 6.657 km TBM tunnel, 5.5 m diameter | Water supply |
| Delhi Metro Phase II underground package BC-16 | Delhi, India | Contractor | 8.03 km twin tunnels, 4 underground stations | Metro | |
| Mumbai Metro Line 3 package UGC-03 | Mumbai, India | Contractor | 5.1 km, 5 underground stations between Mumbai Central and Worli | Metro | |
| Digras high-level barrage | India | Contractor | 33.7 m high, 257 m long, 14 gates | Water resources | |
| Mongra main irrigation canal | India | Contractor | 33.5 km main canal, 15 km distributary, 2 tunnels | Irrigation |
Official registrations and listings
Oman Tender Board (Secretariat General for Tenders)
Registered companies
Licence no. U55101MH1977PLC114178 Listed as SOMA ENTERPRISE LIMITED See the list · Checked 21 Nov 2026
Company detail
Leadership of Soma Enterprise Limited.
Leadership
- Rajendra Prasad MagantiChairman
- Ankineedu MagantiManaging Director
- B. Ramesh KumarDirector
- M.M. Prabhakar V. PrasadDirector
Sources
- Home | SOMA - Soma Enterprise Ltd, read 23 Nov 2026
- Registered companies - Oman Tender Board (Secretariat General for Tenders), read 21 Nov 2026