TAQA Transmission
Location
Abu Dhabi, UAEOverview
TAQA Transmission is a developer or client based in Abu Dhabi, UAE.
It is named as the client on 6 contract awards.
Company type
| Role | Developer or client |
Key facts
| Based in | Abu Dhabi, UAE |
Contracts awarded
| Contract | Scope | Contractor | Role | Value | Date | Status | Source |
|---|---|---|---|---|---|---|---|
| 400kV overhead transmission line | Design, supply and installation of a 400kV overhead line; km not stated | Elsewedy Electric T&D | EPC | - | 18 Sept 2025 | Unconfirmed | Global Transmission Report |
| Retirement of 1,640MW plant in east Abu Dhabi (decommission 2029) | Programme management consultancy for plant decommissioning | Turner & Townsend | PMC | - | 20 Aug 2025 | Unconfirmed | MEED (teaser) |
| Nexus Scheme Phase 1 power and water transmission | Programme management consultancy over EPC packages | KBR | PMC | - | Jul 2025 | Checked | TipRanks/TheFly, Energy-Pedia |
| Nexus Bulk Transmission Scheme Phase 1, Lot 9 (Masdar) N-19957.4 | 132/33kV substations and 132kV interconnection cabling; handover Jun 2027 | Emarat Aloula Contracting | subcontractor | - | 20 Jun 2025 | Checked | Ali & Sons (EAC parent) |
| Nexus bulk transmission scheme phase 1 - lot 9 (Masdar) | 132/33kV substations and 132kV cables | Emarat Aloula Contracting (EAC) | EPC | - | 20 Jun 2025 | Checked | Ali & Sons |
| ICAD-4 400/220kV substation | Turnkey EPC 400/220/33kV GIS substation, 500MVA transformers, control/protection, SCMS, telecom/LDC, civils, MEP; supports Sas Al Nakheel plant retirement; commissioning 2028 | Linxon | EPC | - | 19 Feb 2025 | Unconfirmed | Saudi Gulf Projects |
From public announcements, stock exchange filings and press; values as announced.