TAQA Water Solutions
Location
Abu Dhabi, UAEOverview
Based in Abu Dhabi, UAE, TAQA Water Solutions is a developer or client.
Public announcements name it on one contract award, the latest in 2026. The client named is Ras Al Khaimah Wastewater Authority (RAKWA), overseen by the Public Services Department. It is named as the client on 6 contract awards.
Company type
| Role | Developer or client |
Key facts
| Based in | Abu Dhabi, UAE |
| Contracts named | 1 (latest 2026) |
Contracts and awards
| Contract | Scope | Awarded by | Role | Value | Date | Status | Source |
|---|---|---|---|---|---|---|---|
| Ras Al Khaimah Wastewater Treatment Plant PPP | Design, finance, build, own, operate and transfer of 60,000 cu m/day sewage treatment plant (expandable to 150,000) with sewer mains, pumping stations, effluent transmission and emergency outfall; long-term concession | Ras Al Khaimah Wastewater Authority (RAKWA), overseen by the Public Services Department | JV member - EtihadWE, TAQA Water Solutions and Saur International (consortium) | c. AED 1,101.8mUSD 300m | 2 Feb 2026 | Checked | Zawya (RAKWA press release), Smart Water Magazine, InfraPPP World |
Contracts awarded
| Contract | Scope | Contractor | Role | Value | Date | Status | Source |
|---|---|---|---|---|---|---|---|
| Sewage network O&M - three catchments | Operation and maintenance | Saur | subcontractor | - | 21 Oct 2026 | Unconfirmed | MEED (free teaser) |
| Sewage network O&M, three Abu Dhabi catchment zones | Operation and maintenance of sewage network services, single package | Saur | main contractor | - | 21 Oct 2026 | Unconfirmed | MEED |
| Abu Dhabi emergency lagoon (1m m3) | E&C of 1m m3 lagoon, inlet/outlet structures, HDPE pipelines, pumps and valves; 24 months | NMDC Infra | EPC | AED 288m | 18 Jun 2026 | Checked | Zawya, SaudiGulf Projects |
| STEP Terminal Pumping Station PS01 rehabilitation (Strategic Tunnel Enhancement Programme) | Replace/refurbish mechanical assets, disinfection and chemical dosing, electrical and control upgrades, new pipework, ventilation and odour control; works from Q3 2026 to 2028 | Tamas Projects | EPC | AED 599mUSD 163m | 1 Jun 2026 | Checked | Smart Water Magazine, MEED (headline only), MEED |
| Abu Dhabi water treatment SCADA system | Siemens-based SCADA and new control centre linking 43 treatment plants and 260 pumping stations; consultant TVA Engineering | Electro Mechanical Company | main contractor | AED 95m | 18 Dec 2024 | Unconfirmed | MEED (teaser), Saudi Gulf Projects |
| Wastewater management contract - Al Bahia, Al Sader, Al Shaliela, Taweelah | 9.5 km gravity wastewater line, decommissioning of several pumping stations, capacity raised to 120,000 m3/d | Gulf Contractors Company | main contractor | AED 150m | 18 Sept 2024 | Checked | Smart Water Magazine, Zawya (headline only) |
From public announcements, stock exchange filings and press; values as announced.
In the news
- Kun.uzUAE's TAQA Water Solutions considers participation in Uzbekistan's water infrastructure upgrades16 Jul 2026
- DredgeWireNMDC Infra Awarded AED 288 Million Emergency Lagoon Project by TAQA Water Solutions in Abu Dhabi22 Jun 2026
- www.wam.aeINTRATOMICS, TAQA Water Solutions, MAGMA sign MoU to convert Abu Dhabi’s biosolids into graphene6 May 2026
- مكتب أبوظبي الإعلاميStrategic public-private partnership comprising TAQA Water Solutions to develop largest Ras Al Khaimah Wastewater Treatment Plant30 Jan 2026