Tecnimont S P A
Abu Dhabi branch of Tecnimont S.p.A., Milan - part of MAIRE
Overview
Tecnimont is the Milan-based engineering, procurement and construction (EPC) contractor of the Italian MAIRE group, building gas processing, petrochemical, polymer and fertiliser plants worldwide. This record covers its Abu Dhabi branch, which in 2023 moved into a new office at the Towers at the Trade Center, Abu Dhabi Mall.
The company has worked in the UAE since 1999, when it started on the Borouge polyolefins complex at Ruwais and went on to build each of its expansion phases for the ADNOC and Borealis joint venture. Its UAE record also includes ADCO's Dabb'iya surface facilities, gas dehydration work for ADGAS on Das Island and the first section of the Etihad Rail line from Habshan to Ruwais. In 2023 ADNOC gave it the onshore package of the Hail and Ghasha sour gas development, worth USD 8.7bn and the largest award in MAIRE's history, and in 2026 ADNOC Gas added the USD 4.3bn third phase of the Rich Gas Development at Ruwais.
Company type
| Role | Main contractor |
| Legal form | Branch of an Italian joint-stock company (S.p.A.) |
| Sectors | Oil and gas, gas processing, petrochemicals, polymers, fertilisers, rail |
| Services | Engineering, procurement and construction (EPC), FEED, revamping, O&M services |
Key facts
| Parent | MAIRE (listed on the Milan Stock Exchange), owner since 2005 |
| Global headquarters | Via Gaetano De Castillia 6A, Milan, Italy (group) |
| In the UAE since | 1999 (Borouge complex, Ruwais) |
| Largest UAE award | Hail and Ghasha onshore EPC for ADNOC, USD 8.7bn (2023) - largest award in MAIRE group history |
| Grade | Special category engineering consultancy office, Abu Dhabi Department of Municipalities and Transport (valid until 5 Oct 2027) |
Projects
Scroll the table sideways to see every column.
| Project | Location | Year | Client | Role | Scale | Sector | Status |
|---|---|---|---|---|---|---|---|
| Rich Gas Development Phase 3 - Ruwais NGL fractionation Train 5 | Ruwais, United Arab Emirates | 2026 | ADNOC Gas | EPC contractor | USD 4.3bn; 23,000 t/d (about 8 Mtpa) NGL output | Oil and gas - gas processing | Ongoing |
| Hail and Ghasha development - onshore facilities | Abu Dhabi, United Arab Emirates | 2023 | ADNOC | EPC contractor | USD 8.7bn; 1.5 bn scf/d sour gas | Oil and gas - sour gas processing | |
| Borouge 4 expansion - three EPC packages | Ruwais, United Arab Emirates | 2021 | Borouge (ADNOC and Borealis) | EPC contractor | Petrochemicals - polymers | ||
| Borouge new polypropylene unit | Ruwais, United Arab Emirates | 2018 | Borouge | EPC contractor | Petrochemicals - polymers | ||
| Borouge 3 expansion | Ruwais, United Arab Emirates | 2015 | Abu Dhabi Polymers Co. (Borouge) | EPC contractor | PE4 and PE5 540,000 t/y each, PP3 480,000 t/y, PP4 428,000 t/y, LDPE 350,000 t/y | Petrochemicals - polymers | Completed |
| Borouge 2 expansion | Ruwais, United Arab Emirates | 2010 | Abu Dhabi Polymers Co. (Borouge) | EPC contractor | PE3 540,000 t/y, PP1 and PP2 400,000 t/y each | Petrochemicals - polymers | |
| Borouge 1 | Ruwais, United Arab Emirates | 2001 | Abu Dhabi Polymers Co. (Borouge) | EPC contractor | PE1 and PE2 250,000 t/y each | Petrochemicals - polymers | |
| Dabb'iya Surface Facilities Phase III | United Arab Emirates | 2014 | ADCO | Sole contractor | Oil and gas | ||
| Gas Dehydration Facility IGD expansion, Das Island | Das Island, United Arab Emirates | 2015 | ADGAS | EPC contractor | Oil and gas - gas processing | ||
| Habshan 5 IGD | United Arab Emirates | Oil and gas - gas processing | |||||
| Etihad Rail - first section, Habshan to Ruwais | United Arab Emirates | 2014 | Rail | Completed |
Official registrations and listings
Abu Dhabi Department of Municipalities and Transport
Engineering Firms with Valid Classification
Licence no. CN-1001484 Listed as TECNIMONT S P A - ABU DHABI See the list · Checked 23 Nov 2026
Company detail
History, locations and offices of Tecnimont S P A.
History
- milestone
Tecnimont incorporated into the Montedison group as its plant engineering arm
- expansion
Starts work on the Borouge polyolefins complex at Ruwais, its entry into the UAE
- project
EPC of Borouge 1 polyethylene units PE1 and PE2
- deal
Acquired by Maire, forming the Maire Tecnimont group (listed in Milan in 2007)
- project
Borouge 2 expansion adds PE3 and two polypropylene units
- strategy
Group starts a turnaround with recapitalisation, management reshuffle and deleveraging
- project
Completes the first Etihad Rail section from Habshan to Ruwais; wins ADCO's Dabb'iya Phase III, then its largest single-contractor award
- project
Dabb'iya Surface Facilities Phase III, United Arab Emirates - Sole contractor
- project
Etihad Rail - first section, Habshan to Ruwais, United Arab Emirates
- project
Borouge 3 completed; EPC award from ADGAS for the IGD expansion on Das Island
- project
Borouge 3 expansion, Ruwais, United Arab Emirates - EPC contractor
- project
Gas Dehydration Facility IGD expansion, Das Island, Das Island, United Arab Emirates - EPC contractor
- project
EPC award for a new polypropylene unit at Borouge
- project
Borouge new polypropylene unit, Ruwais, United Arab Emirates - EPC contractor
- project
Signs three EPC contracts for the Borouge 4 expansion at Ruwais
- project
Borouge 4 expansion - three EPC packages, Ruwais, United Arab Emirates - EPC contractor
- rebrand
Parent rebrands as MAIRE and launches its 2023-2032 plan splitting technology and E&C businesses
- expansion
Opens a new Abu Dhabi headquarters for Tecnimont UAE
- deal
Wins the USD 8.7bn onshore EPC contract for ADNOC's Hail and Ghasha project, the largest in group history
- project
Hail and Ghasha development - onshore facilities, Abu Dhabi, United Arab Emirates - EPC contractor
- deal
Details the USD 4.3bn EPC contract from ADNOC Gas for Rich Gas Development Phase 3 at Ruwais
- project
Rich Gas Development Phase 3 - Ruwais NGL fractionation Train 5, Ruwais, United Arab Emirates - EPC contractor
Where the company operates
Italy
1 office
- MilanVia Gaetano De Castillia 6A, 20124
United Arab Emirates
1 office · 11 projects
- Abu Dhabi5th Floor, Towers at The Trade Center Abu Dhabi Mall, 10th Street, PO Box 51120, Al Zahiyah
- Rich Gas Development Phase 3 - Ruwais NGL fractionation Train 5
- Hail and Ghasha development - onshore facilities
- Borouge 4 expansion - three EPC packages
- Borouge new polypropylene unit
- Borouge 3 expansion
- Borouge 2 expansion
- Borouge 1
- Dabb'iya Surface Facilities Phase III
- Gas Dehydration Facility IGD expansion, Das Island
- Habshan 5 IGD
- Etihad Rail - first section, Habshan to Ruwais
Office directory
| City | Country | Address | Phone |
|---|---|---|---|
| Milan | Italy | Via Gaetano De Castillia 6A, 20124 | +39 02 63131 |
| Abu Dhabi | United Arab Emirates | 5th Floor, Towers at The Trade Center Abu Dhabi Mall, 10th Street, PO Box 51120, Al Zahiyah | |
| No office matches. | |||
2 offices
Sources
- Tecnimont - Official Website - Tecnimont, read 23 Nov 2026
- Tecnimont UAE - Tecnimont, read 23 Nov 2026
- About us - global presence - Tecnimont, read 23 Nov 2026
- Our history - Tecnimont, read 23 Nov 2026
- Hail and Ghasha project - Tecnimont, read 23 Nov 2026
- Borouge complex development and expansion - Tecnimont, read 23 Nov 2026
- Tecnimont continues to serve the Abu Dhabi energy industry: additional details on ADNOC's Rich Gas Development project - phase 3 - Tecnimont (MAIRE press release), read 23 Nov 2026
- Engineering Firms with Valid Classification - Abu Dhabi Department of Municipalities and Transport, read 23 Nov 2026
Similar companies
More main contractors in Abu Dhabi
- Emirates Zone Companies Representation - Sole Proprietorship L.L.C.
- Druve Transport And General Contracting LLC
- Trenton General Contracting and Real Estate Manage
- Osool Alroyah General Contracting LLC
- Pak Speen Transportation And Maintenance Contracting LLC
- Asymptote General Contracting LLC
- Safcom General Contracting
- Hawk Energy Oilfield Equipment Trading L.L.C