Unified Construction Contracting
Location
Across QatarOverview
Unified Construction Contracting is classed in the directory as a main contractor working across Qatar. Its earliest dated listing in the records we hold is from 2020.
60 contracts are named for it in US federal contract awards (USAspending.gov), the latest dated 2024.
Company type
| Role | Main contractor |
Key facts
| Earliest dated listing | 2020 |
| Registers and lists | 1 award list |
| Contracts named | 60 (latest 2024) |
Listed on
US federal contract awards (USAspending.gov, public domain), not a government register of the country
US federal construction contract awards
Entry US federal construction contracts (NAICS 23): 68 (2019-2024) 60 contracts named - see Contracts on public award lists
See the list · Checked 23 Nov 2026
Contracts on public award lists
Named in US federal contract awards (USAspending.gov)
| Contract | Year |
|---|---|
| Server room D101 in facility 6874 requires the replacement of four (4) old computer room air conditioning (CRAC) Units… (USD 76k; Sep 2024; US Air Force) | 2024 |
| See section j - Statement of objectives dated 15 june 2024 (USD 188k; Sep 2024; US Air Force) | 2024 |
| Installing epoxy flooring into BLDG 3729 (USD 36k; May 2024; US Air Force) | 2024 |
| Installation of chillers and associated HVAC equipment (USD 214k; Jan 2024; US Air Force) | 2024 |
| Removal of construction debris from laydown yards (USD 905k; Nov 2023; US Air Force) | 2023 |
| Reconstruct elrs supply ramp (USD 48k; Sep 2023; US Air Force) | 2023 |
| Remove existing concrete at the volleyball court and install new concrete (USD 52k; Sep 2023; US Air Force) | 2023 |
| Replace vehicle maintenance chillers auab (USD 132k; Aug 2023; US Air Force) | 2023 |
| Renovate pull through ambulance bay (USD 38k; Sep 2022; US Air Force) | 2022 |
| Design and construction of HVAC system for mns/facp and misc munitions building (USD 294k; Sep 2022; US Air Force) | 2022 |
| Construct joint training facility (USD 181k; Aug 2022; US Air Force) | 2022 |
| 23-0123 repair weather tower foundation (USD 42k; Jul 2022; US Air Force) | 2022 |
Show all 60 contracts
| PKB: 22-0063 install security fence water storage (B1094) (USD 145k; Jul 2022; US Air Force) | 2022 |
| Replace aircraft maintenance shop doors, HVAC, plumbing fixtures (USD 81k; Jul 2022; US Air Force) | 2022 |
| Al udeid air base requires the replacement of the HVAC system (USD 63k; Jul 2022; US Air Force) | 2022 |
| Socom server room HVAC (USD 393k; Jul 2022; US Air Force) | 2022 |
| Replace and repair HVAC and ducting for multiple buildings on al udeid air base (USD 188k; Jul 2022; US Air Force) | 2022 |
| Replace concrete slabs airfield (USD 51k; Jun 2022; US Air Force) | 2022 |
| This requirement will be awarded under the existing saber idiq FA570219D0003. the requirement entails installing lights… (USD 352k; Jun 2022; US Air Force) | 2022 |
| This requirement will be completed under the existing saber contract FA570219D0003. this requirement entails repainting… (USD 298k; Jun 2022; US Air Force) | 2022 |
| Repair & repurpose alert hangar room (B5200) (USD 45k; Jun 2022; US Air Force) | 2022 |
| This requirement is a construction project to be completed by the saber contractor. the contractor will replace the… (USD 54k; Jun 2022; US Air Force) | 2022 |
| Alua 22-0086 repair roof and roll up doors (USD 87k; Jun 2022; US Air Force) | 2022 |
| Alua 22-0036 & 22-0116 replace rollup doors multi (USD 198k; Jun 2022; US Air Force) | 2022 |
| Replace ahu emxo facility building 6851 al udeid (USD 66k; Jun 2022; US Air Force) | 2022 |
| Construct fence ada peb (USD 121k; May 2022; US Air Force) | 2022 |
| Gsa secure open storage (USD 60k; May 2022; US Air Force) | 2022 |
| Upgrade fire panels in operations town, AL Udeid (USD 252k; Apr 2022; US Air Force) | 2022 |
| Renovate eacs radar support facility B9430 (USD 66k; Apr 2022; US Air Force) | 2022 |
| Repair north ramp construction project (USD 527k; Apr 2022; US Air Force) | 2022 |
| Install mooring points at soccent ramp (USD 44k; Feb 2022; US Air Force) | 2022 |
| Construct outdoor sports courts at BPC gym (USD 732k; Sep 2021; US Air Force) | 2021 |
| Renovate network control center (NCC) (USD 224k; Sep 2021; US Air Force) | 2021 |
| Zink refresh (renovation) (USD 250k; Sep 2021; US Air Force) | 2021 |
| Construct dla yard projects (USD 1.3m; Sep 2021; US Air Force) | 2021 |
| CFH fans exhaust install (USD 76k; Sep 2021; US Air Force) | 2021 |
| RPR pol admin & test facility (USD 222k; Aug 2021; US Air Force) | 2021 |
| Crack seal and paint buildings A8 and A9 (USD 100k; Jul 2021; US Air Force) | 2021 |
| Construct dumpster enclosures (USD 358k; Jun 2021; US Air Force) | 2021 |
| Saber - Repair electronic counter measures shop wall (USD 31k; Jun 2021; US Air Force) | 2021 |
| BPC outdoor space (USD 269k; May 2021; US Air Force) | 2021 |
| Bird netting multi facilities (USD 164k; May 2021; US Air Force) | 2021 |
| Install fire alarm panel (USD 37k; May 2021; US Air Force) | 2021 |
| Repair radar facility (USD 134k; Apr 2021; US Air Force) | 2021 |
| Repair food storage warehouse light fixtures (USD 41k; Apr 2021; US Air Force) | 2021 |
| Repair roof B.8111 (USD 234k; Mar 2021; US Air Force) | 2021 |
| Repair csaf stucco (USD 138k; Mar 2021; US Air Force) | 2021 |
| Msa bird netting (USD 59k; Feb 2021; US Air Force) | 2021 |
| Supply of all required material, manpower, equipment, supervision and logistical support to replace expansion system for… (USD 118k; Feb 2021; US Air Force) | 2021 |
| Upgrade pol yard manual gates - Automated remotely operated gates (USD 303k; Feb 2021; US Air Force) | 2021 |
| Construct secure storage facility (USD 32k; Dec 2020; US Air Force) | 2020 |
| Repair/replace emdg HVAC (USD 163k; Dec 2020; US Air Force) | 2020 |
| Saber - Msa cameras and ecp gates (USD 1.1m; Nov 2020; US Air Force) | 2020 |
| Repair ner pump house B6180 (USD 231k; Sep 2020; US Air Force) | 2020 |
| Repair auab CC pool (USD 337k; Sep 2020; US Air Force) | 2020 |
| Caoc sunshade B6874 (USD 83k; Sep 2020; US Air Force) | 2020 |
| Saber- repair DS 9-12 (USD 493k; Sep 2020; US Air Force) | 2020 |
| Saber construction-building 2212&2213 (USD 324k; Sep 2020; US Air Force) | 2020 |
| Replace HVAC equipment in B10145 (USD 285k; Sep 2020; US Air Force) | 2020 |
| Saber task order-design/build arcent hazmat (USD 173k; Sep 2020; US Air Force) | 2020 |
Titles as the award lists print them.