Velosi Asset Integrity And Engineering Consultancy Services LLC
Overview
Velosi Asset Integrity and Engineering Consultancy Services LLC is the Abu Dhabi head office of Velosi, an asset integrity, HSE and engineering consultancy for the oil, gas and energy industries, whose corporate office is in St Helier, Jersey. It provides risk-based inspection, pipeline, structural, pressure equipment and well integrity management systems, reliability and maintenance studies, corrosion management, fitness-for-service and life extension assessments.
Its HSE work covers HAZID, HAZOP, SIMOPS and other process safety studies and HSE impact assessments, and it sells its own asset integrity software, Velosi AIMS (formerly VAIL-Plant), and runs a training institute. UAE projects include the HSEIA for Project Volta, a utility plant at the Taziz Industrial Chemical Park in Ruwais, and HSE studies for the EPC phase of ADOC's Mubarraz redevelopment offshore Abu Dhabi; it also lists work for Saudi Aramco and Sonatrach.
Company type
| Role | Consultant |
| Legal form | Limited liability company (LLC) |
| Sectors | Oil and gas, petrochemicals, energy, utilities |
| Services | Asset integrity management, risk-based inspection, HSE and process safety studies, reliability engineering, asset integrity software, technical training |
Official registrations and listings
Abu Dhabi Department of Municipalities and Transport
Engineering Firms with Valid Classification
Licence no. CN-2736949 Listed as VELOSI ASSET INTEGRITY AND ENGINEERING CONSULTANCY SERVICES L.L.C. See the list · Checked 23 Nov 2026
From the company
- velosiaims.comDay 04 at ADIPEC 2026: Optimized Operations with Innovative Solutions Asset Integrity Management13 Nov 2026
- velosiaims.comConnecting, Leading & Advancing the Future at ADIPEC 2026 Asset Integrity Management6 Nov 2026
- velosiaims.comDay 03 at ADIPEC 2026: From Site Challenges to Strategic Solutions – Real Conversations Continue Asset Integrity Management6 Nov 2026
- velosiaims.comDay 02 at ADIPEC 2026: Stronger Connections, Safer Assets Asset Integrity Management4 Nov 2026
- velosiaims.comDay 01 AT ADIPEC 2026: Where Energy Security Starts With Asset Integrity Asset Integrity Management2 Nov 2026
- velosiaims.comVelosi is Exhibiting at ADIPEC 2026 Asset Integrity Management8 Oct 2026
Company detail
History, offices and projects of Velosi Asset Integrity And Engineering Consultancy Services LLC.
History
- deal
Awarded a RAM study by KENT for the ADNOC Gas P5.0 project at the Asab and Bu Hasa assets
Office directory
| City | Country | Address | |
|---|---|---|---|
| Abu Dhabi | United Arab Emirates | Suite 1104, Al-Ghaith Tower, Hamdan Bin Mohammed Street, P.O. Box 114192 | |
| St Helier | Jersey | 5th Floor, 37 Esplanade, St Helier JE1 2TR (corporate office) | |
| No office matches. | |||
2 offices
All projects
| Project | Country | Sector | Year | Detail |
|---|---|---|---|---|
| HSEIA and HSE studies for Project Volta, Taziz Industrial Chemical Park | Ruwais, United Arab Emirates | Oil and gas | ||
| HSE studies for Mubarraz redevelopment project, EPC phase | Abu Dhabi, United Arab Emirates | Oil and gas | Offshore Mubarraz field and Mubarraz Island facilities | |
| AIV/FIV analysis for Nasr 100 MBD Phase 2 re-select and FEED (ADNOC Offshore) | United Arab Emirates | Oil and gas | ||
| Corrosion risk assessment, PE-110 Naphtha Upgradation Project (ADNOC Takreer) | United Arab Emirates | Oil and gas | ||
| HSEIA, HAZOP and HSECES, Sunrise 48-inch GCS - Margham pipeline | United Arab Emirates | Oil and gas | ||
| Fire risk assessment gap study, Umm Al Dalkh | United Arab Emirates | Oil and gas | ||
| HSEIA and HSECES, Refinery Off-Gases Recovery project (FEED) | United Arab Emirates | Oil and gas | ||
| EPC-phase HSEIA, Abu Dhabi gas distribution network | Abu Dhabi, United Arab Emirates | Oil and gas | ||
| Risk-based inspection implementation, ADNOC Sour Gas | United Arab Emirates | Oil and gas | ||
| Inspection and corrosion management system audit, Borouge plant | Ruwais, United Arab Emirates | Oil and gas | ||
| FEED services for flare minimisation, Upper Zakum | United Arab Emirates | Oil and gas | ||
| RBI and remaining life assessment, 18-inch pipeline Hail Site Terminal - Mubarraz Island | United Arab Emirates | Oil and gas | ||
| Onshore drilling rig move manual update | United Arab Emirates | Oil and gas | ||
| Project management manual update with value assurance process | United Arab Emirates | Oil and gas | ||
| Flexibility of crude oil facilities, Fujairah Main Oil Terminals | Fujairah, United Arab Emirates | Oil and gas | ||
| HSE studies, Project Lightning independent subsea HVDC system | United Arab Emirates | Oil and gas | ||
| HSE consultancy for GS&S assets | United Arab Emirates | Oil and gas | ||
| Maintenance SOPs for concrete and steel structures | United Arab Emirates | Oil and gas | ||
| ADNOC LNG trains operational life extension - independent assessment and verification | United Arab Emirates | Oil and gas | ||
| Asset integrity management system for ADNOC Offshore and Al Yasat | United Arab Emirates | Oil and gas | ||
| Terminal operations evaluation, Middle East Tanking Solutions, Fujairah Oil Industry Zone | Fujairah, United Arab Emirates | Oil and gas | ||
| Risk-based inspection study, Das Island (GTG) | United Arab Emirates | Oil and gas | ||
| Corrosion risk assessment, Borouge 2 plant | United Arab Emirates | Oil and gas | ||
| Carbon Black Master Batch FEED services | United Arab Emirates | Oil and gas | ||
| HSEIA, Centralized Utilities Plant, Ruwais Derivatives Park | Ruwais, United Arab Emirates | Oil and gas | ||
| Waste heat recovery project, FEED-phase HSEIA | United Arab Emirates | Oil and gas | ||
| Integrity and remaining life assessment of HP boiler, Ruwais Refinery (East) | Ruwais, United Arab Emirates | Oil and gas | ||
| HSE critical integrity verification, ADNOC Refining facilities | United Arab Emirates | Oil and gas | ||
| Fire risk assessment implementation, basic engineering study (Phase 1) | United Arab Emirates | Oil and gas | ||
| Critical drawings update, Zirku Island | United Arab Emirates | Oil and gas | ||
| Operating manuals and procedures update, ADNOC Onshore terminals and pipelines | United Arab Emirates | Oil and gas | ||
| Design review of thermal storage tanks, Dubai Creek Harbour district cooling plant | Dubai, United Arab Emirates | Utilities | ||
| Design review of natural gas pipework, building at Al Raha Beach | Abu Dhabi, United Arab Emirates | Utilities | ||
| RAM study, ADNOC Gas P5.0 project (Asab and Bu Hasa assets) | United Arab Emirates | Oil and gas | 2026 | Contract announced 22 Jul 2026 |
Sources
- Home - Velosi Asset Integrity, Engineering, HSE & Software Consultants - Velosi Asset Integrity Ltd, read 22 Nov 2026
- About Us - Velosi Asset Integrity Ltd, read 22 Nov 2026
- HSEIA & Associated HSE Studies - Velosi Asset Integrity Ltd, read 22 Nov 2026
- HSE Studies for Mubarraz Redevelopment Project (EPC Phase) - Velosi Asset Integrity Ltd, read 22 Nov 2026
- Engineering Firms with Valid Classification - Abu Dhabi Department of Municipalities and Transport, read 16 Nov 2026
- Our Case Studies - Velosi Asset Integrity & Engineering, read 23 Nov 2026
- Velosi to lead RAM study for ADNOC Gas P5.0 project under contract awarded by KENT - Velosi Asset Integrity & Engineering, read 23 Nov 2026